Similar Projects
Holly Acres Estates
Renovation, Alteration
Bidding
Erie, PA 16509

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Well No. 3 Replacement Well Drilling, Construction, and Aquifer Testing
Infrastructure
Post-Bid
Saltillo, PA

Water Pollution Control Plant and Pump Station Improvements
Results
Jamestown, PA 16134

Middle School Pump Station Upgrade
Results
Conneaut Lake, PA 16316

Turbine Pump for Water Treatment Plant
Post-Bid
PA

Cleaning Out and Plugging One (1) Abandoned Well, Mill Creek Township, Lycoming County
Results
$100,000 to $200,000 est. value
PA

Pressure Sewer Construction and Grinder Pump Installation
Post-Bid
Grove City, PA

Mellon Square Parking Garage Sump Pump Repair
Results
Less than $195,000 est. value
Pittsburgh, PA 15222

Complete Pump and Motor Assembly
Infrastructure
Post-Bid
Philadelphia, PA

BFP Feed Pump Replacement Project - General Construction
Results
$15,000 to $20,000 est. value
Northumberland, PA

Overhaul Bernville Storm Water Pump
Term Contract
Post-Bid
Bernville, PA 19506

2020 Water System Improvements - General Construction
Results
$1,125,000 est. value
Tower City, PA

Fifteen (15) Manhole Repairs and One (1) Wet Well Repair
Infrastructure
Post-Bid
Clarendon, PA

Replacement of Backwash Pumps, Valves and Vacuum Priming System
Results
$2,000,000 to $300,000 est. value
Philadelphia, PA 19129

Last Updated 05/23/2022 05:25 AM
Project Title

Wet Well Lining at Two Locations

Physical Address View project details and contacts
City, State (County) Downingtown, PA   (Chester County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chestnut Ridge Pump Station Wet Well and Dupont WWTP Wet Well Lining Bid

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents