Similar Projects
SR 4022 over Bridge Buffalo Creek
New Construction, Infrastructure
Design
$2,300,000 est. value
PA

SR 4022 over Bridge Buffalo Creek
New Construction, Infrastructure
Design
$2,300,000 est. value
PA

Chartiers Creek 53
Renovation, Infrastructure
Bidding
$1,000,000 to $2,499,999 est. value
Washington, PA 15301

Pavement Maintenance on Various Roads Fiber Reinforced Seal Coat
Post-Bid
Canonsburg, PA

West Walnut Street Improvements
Post-Bid
Washington, PA 15301

SIP 12-20-SI4-1
Results
$2,500,000 to $4,999,999 est. value
PA

2020 Road Improvements Project
Results
Washington, PA 15301

Contract A - Pavement Maintenance on Various Roads Throughout the Township
Post-Bid
Cecil, PA

2020 Pavement Rehabilitation Project
Results
Canonsburg, PA

Contract B - Pavement Maintenance on Various Roads Throughout the Township
Post-Bid
Cecil, PA

Mcelree Road Paving Project
Results
Washington, PA 15301

Aggregate Material
Post-Bid
Washington, PA

2020 Paving Project
Results
Charleroi, North Charleroi, PA 15022

2021 Pavement Maintenance Program Contract A, B
Post-Bid
Houston, PA

2020 Pavement Maintenance Program - Contract C
Results
Houston, PA 15342

Reported 06/21/2022 10:21 AM
Project Title

SR 4012 over Robinson Run-1-DFB

Physical Address View project details and contacts
City, State (County) Washington, PA   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving and new construction of a bridge / tunnel in Washington, Pennsylvania. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel. SR 4012 (St. Johns Street) over Robinson Run Midway Borough, Washington County BMS# 62 4012 0140 0902 Primary Improvement Type: Bridge Replacement As of June 17, 2022, the project is in future development stage. Anticipated letting date is June 09, 2022. PennDOT - SR 4012 over Robinson Run-1-DFB *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents