Similar Projects
Selective Improvements at Four Developments
Alteration
Bidding
$350,000 est. value
Metter, GA

Big Creek Greenway Phase 2 Rehab
Infrastructure
Bidding
Cumming, GA

Annual Contract for Sidewalk Construction Services
Term Contract
Post-Bid
Hampton, GA 30228

Brick Pavers
Post-Bid
La Grange, GA 30240

Briarcliff Road Sidewalk (Briar Vista Terrace and Clifton Road)
Results
Decatur, GA 30032

Lou Walker Senior Center ADA Improvements
Results
Decatur, GA 30058

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Emmanuel Seventh Day Adventist Church Parking Lot Expansion
New Construction
Construction
Lithonia, GA 30058

Church Street and Tucker Industrial Road Sidewalk Project
Infrastructure
Bidding
Tucker, GA

2019 CDBG Sidewalks
Post-Bid
Less than $600,000 est. value
Brunswick, GA 31520

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

1200 Lake Hearn Medical Office Building Parking Lot Improvements
Renovation
Construction
Sandy Springs, GA

South Fry Streets Pedestrian Improvements
Infrastructure
Bidding
Valdosta, GA

Americus Pedestrian Improvements Along US 19
Post-Bid
Americus, GA 31709

Bemiss Road and Fry Street Sidewalk
Results
Bemiss, GA 31602

Last Updated 09/16/2021 11:27 AM
Project Title

Sidewalk Repairs and Replacement

Physical Address View project details and contacts
City, State (County) Stockbridge, GA   (Clayton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sidewalk repair and/or replacement to repair or replace selected sidewalks in the City. Respondents must comply with the minimum qualifications and shall submit a bid to install four (4”) inch thick sidewalk (six (6”) inch for all driveways) for all sections to be replaced as described in this RFP. Respondents should take note that the City is requesting an itemized bid response for completion of each section of sidewalk. The final sections of sidewalk to be repaired will be agreed upon by both parties before construction begins. The work to be performed, in general, consists of removing and replacing damaged sections of existing concrete sidewalk, curb, gutter, curb ramp, and driveway; repairing sections of failed asphalt concrete pavement; and replacement of curb inlets and concrete repair of adjacent sidewalk flags. The work shall include traffic control, saw cutting, excavation, backfilling, compaction; installation of root barriers, patching asphalt conforms adjacent to new gutters, and clearing and grubbing. Locations of work will be throughout the City of Stockbridge. In areas of sidewalk construction, water meter boxes and gate valves shall be adjusted to final sidewalk or parkway grade. All labor and materials to accomplish adjustments and/or relocations shall be included in unit costs for constructing/repairing sidewalks.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents