Last Updated | 06/30/2023 01:05 AM |
Project Title | Amador County SB 863 Jail Expansion |
Physical Address | View project details and contacts |
City, State (County) | Jackson, CA 95642 (Amador County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Prison/Jail, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $16,500,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Deadline for Bidders seeking Prequalification to submit questions and requests for clarification regarding the Prequalification process and application packet. Please submit to www.publicpurchase.com May 4, 2023 by 1:30pm The Work includes, but is not limited to, the construction of Jail Expansion, located at 700 Court Street, Jackson, California. The proposed project consists of a new two-story jail facility with a partial basement. The new building is approximately 12,700 sq, ft. in area and will be Type I-A construction with Occupancy Group I-3 and will be fully sprinklered. The new jail facility will house cells, dayrooms, program treatment rooms, a dental room, exam rooms, offices, recreation yards, a control room, mechanical equipment rooms, and corridors. Also included in the scope of work will be associated site structures including a Mobile Command Structure and site retaining walls. The jail structure will be constructed of structural steel framing with metal decking at the roof levels and a poured-in-place structural concrete slab at the upper tier level. The ground floor level, over the partial basement area, will be constructed of structural steel framing supporting a composite concrete and metal deck slab. The remainder of the first-floor area will consist of a concrete slabon-grade. The roof and elevated floors will be supported by concrete masonry bearing walls that will also act as the lateral force resisting system for the structure. Poured-in-place concrete retaining walls will be incorporated at the basement level at locations where the soil is to be retained. The foundation for the structure will consist of typical continuous spread footings. The exterior finish of the building will be split-faced masonry and EIFS over rigid insulation. |
||||||||||||||||||||||||||||||||||||||||||
Details | 12,700 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |