Similar Projects
Traffic Signal Replacement - TH 2B
Infrastructure
Conception
$1,200,000 CJ est. value
Warba, MN 55793

Gravel
Term Contract
Design
Swan River, MN 55784

King Elementary - 2023 Renovations, Ventilation, and Site Improvements Project
Renovation, Infrastructure
Bidding
$3,000,000 CJ est. value
Deer River, MN 56636

Grading, Bituminous Surfacing and Bridge 69X01, 69X22 and 69X23
Infrastructure
Bidding
$2,300,000 CJ est. value
Tower, MN 55790

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

Highway 2 East Water Main Extension
Infrastructure
Results
Cohasset, MN

ASV Holdings Addition
Addition, Demolition, Infrastructure - 60,000 SF
Pending Verification
$9,400,000 CJ est. value
Grand Rapids, MN 55744

Replacement Structures at Six Powwow Grounds on the Leech Lake Reservation
Renovation, Infrastructure
Bidding
$110,000 CJ est. value
Squaw Lake, MN 56681

Northome Road Grading
Infrastructure
Post-Bid
Grand Rapids, MN

Waste Water Treatment at MCF-Togo
Renovation, Infrastructure
Results
$1,512,500 est. value
Cook, MN 55723

Bid Package B - Garage and West Parking Lot Replacement with Adjacent Sidewalks
Infrastructure
Bidding
$500,000 CJ est. value
Grand Rapids, MN 55744

GRANR 2019 Street Improvements
Infrastructure
Post-Bid
$3,148,000 CJ est. value
Grand Rapids, MN 55744

CSAH 3 Road Rehabilitation
Infrastructure
Results
$3,000,000 est. value
Harris, MN 55744

Last Updated 01/08/2024 06:34 PM
Project Title

75,000 Gallon Elevated Tank

Physical Address View project details and contacts
City, State (County) Marble, MN 55764   (Itasca County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $1,224,131 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, Work consists of the construction of one 75,000-gallon steel pedestal spheroid or Hydro Cone elevated water tower complete with concrete foundation, water main piping, painting, electrical, landscaping, and related items of construction. Contractors may bid one or two styles of elevated tanks. The Base Bid will be based on the Site Work and one of the two styles of elevated tanks. Est. Completion Date: Nov. 1, 2024

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents