Similar Projects
ACC DQ 20-6-1018 Carpet Replacement (Tandus)
Post-Bid
Colorado Springs, CO

Wood Floor & Carpet Cleaning And Maintenance
Post-Bid
Lone Tree, CO

CU South 1st Great Hall Renovation Paint / Carpet
Results
Less than $50,000 est. value
Aurora, CO 80045

Mercury Removal Services Package 02
Results
Colorado Springs, CO 80905

Grand Junction Regional Airport Flooring Replacement
Construction
Grand Junction, CO 81501

1161 Transit Drive - Floor Leveling
Post-Bid
Colorado Springs, CO 80903

Mercury Removal Services Package 01
Results
Colorado Springs, CO 80905

Golf Course Restroom Tile Projects
Post-Bid
Denver, CO 80202

CTCF Kitchen Floor Replacement
Results
$750,000 est. value
Colorado Springs, CO

Carpet/Tile Installation at Beech Street Preschool, Lewis-Arriola, and Manaugh Elementary
Post-Bid
Cortez, CO 81321

Johannsen Support Services Center West Wing Carpet, Windows and Lighting
Results
Less than $72,365 est. value
Fort Collins, CO 80521

72--Romo Carpet Replacement B 217 And B 2000
Post-Bid
Estes Park, CO

Aurora History Museum Exterior Site Improvements
Results
$175,000 to $225,000 est. value
Aurora, CO 80012

Carpet Installation
Term Contract
Post-Bid
Golden, CO 80401

PHS - Stain and Polish Concrete Corridor Floors
Results
Fort Collins, CO 80521

Reported 04/21/2021 12:00 AM
Project Title

LMYC Kitchen Flooring

Physical Address View project details and contacts
City, State (County) Golden, CO 80401   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

? The main kitchen is approximately 1,400 square feet. ? Product to be BASF UCRETE® / Sikafloor PurCem or equivalent. ? Material color will be determined by the facility. ? Complete removal of current epoxy floor to prepare for install of product ? Include 4” cove base using the same product. ? The project will be broken out in three phases in order to keep the kitchen operational during the repair - unless all areas can be addressed at the same time without an additional disruption of service. ? Equipment will be removed by the facility and reinstalled after each phase is completed.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents