Similar Projects
Fenning Avenue Reconstruction
Bidding
$5,000,000 est. value
Monticello, MN 55362

Mill, Overlay, and ADA Ramps
Bidding
MN

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Post-Bid
Less than $356,970 est. value
Mankato, MN

CSAH 34 Multi Use Trail
Results
Fergus Falls, MN

CSAH 34 Reconstruction
Results
Fergus Falls, MN 56537

Avery Park Utility and Street Improvements
Bidding
$2,360,000 est. value
Maple Grove, MN

Restoration of Rochester Parking Ramp 6
Post-Bid
$150,000 est. value
Rochester, MN 55904

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

Brooklyn Boulevard (CSAH 152) Reconstruction
Bidding
$10,000,000 to $13,000,000 est. value
Brooklyn Center, MN

Phase 3A-2 Infrastructure Improvements
Post-Bid
Tracy, MN

Veteran's Memorial Improvements
Renovation
Results
Less than $180,000 est. value
Milaca, MN

2021 Walnut Street Area and Nicollet Street Area Improvements
Bidding
Blue Earth, MN 56013

New Heights Elementary School, South Point Elementary School, Central Middle School - 2021 Improvements
Post-Bid
East Grand Forks, MN 56721

South Lake Minnetonka Public Safety Facility Improvements
Results
Shorewood, MN

Last Updated 04/07/2021 06:53 AM
Project Title

Capitol Complex Ramps Repairs

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55101   (Ramsey County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $401,475
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Admin Ramp, 50 Sherburne Avenue: Concrete repair, installation of supplemental steel supports, waterproof deck-coating, expansion joint replacement. 2. 14th Street Ramp, 135 E. 14th Street: Joint sealant replacement, Tee flange connector repair, new vestibule enclosure at top level, added steel protection at snow dump, traffic arrows. 3. State Office Building: Expansion Joint replacement, traffic arrows. 4. Retirement Systems Building Ramp, 60 Empire Drive: Gutter. 5. Anderson Ramp: Traffic Arrows.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents