Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

Well Field Mound and Access Restoration Project
Infrastructure
Post-Bid
$656,000 est. value
New Ulm, MN

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

CSAH 13 between 220th Street and Hanska
Results
$5,927,362 est. value
MN

20th South Street Reconstruction Project
Infrastructure
Post-Bid
New Ulm, MN 56073

2021 Utility, Street and Alley Improvements - Group 1
Results
$3,500,000 est. value
New Ulm, MN

Sewer Vacuum, Hydro-Excavation, and Municipal Pumping Equipment
Alteration
Post-Bid

Raw Water Main Reroute Project-North Well Field
Results
New Ulm, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

CSAH 34 Mill and Overlay and CSAH 35 Reconstruct
Infrastructure
Results
$3,576,810 est. value
MN

Grading and Riprap
Infrastructure
Results

2021 Summit Avenue Improvements
Infrastructure
Results
Hanska, MN 56041

Mill and Overlay, Cold in Place Recycle, Lighting, Pedestrian Crosswalk Flasher System, Snow Fence, and ADA Improvements 8.423 Miles
Infrastructure
Results

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

CSAH 13 (Boundary Street) New Alignment
Infrastructure
Results
$4,876,835 est. value
New Ulm, MN 56073

Last Updated 06/08/2022 01:03 AM
Project Title

2022 Utility, Street and Alley Improvements - Group 1

Physical Address View project details and contacts
City, State (County) New Ulm, MN   (Brown County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes improvements to municipal utilities, streets, alleys, and sidewalks at various locations within the City limits of New Ulm, Minnesota. Approximate quantities of work include: 3,707 LF Water Main; 3,353 LF Sanitary Sewer Main; 120 LF Sanitary Sewer Manhole Structures; 66 Water End Services; 66 Sanitary Sewer End Services; 4,430 LF Curb & Gutter Removals; 15,614 CY Common Excavation; 14,169 TONS Aggregate Base; 4,774 TONS Bituminous Pavement; 6,854 LF Subdrain Tubing; 2,473 LF RCP Storm Sewer Piping; 86 LF Storm Sewer Manhole Structures; 90 LF Storm Sewer Catch Basin Structures; 78 Manhole & Catch Basin Castings; 18,924 SF 4" Concrete Sidewalk; 3,962 SF 6” Concrete Sidewalk; 6,606 LF V624 Curb & Gutter; 236 SY 7" Concrete Driveway Pavement; 5,448 SY Sodding; 2 Street Lighting Systems; and 21 Tree Plantings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents