Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

New Neighborhood School at Monument Ranch
New Construction
Conception
Perris, CA 92570

AutoZone #6032 / Oak View
New Construction, Infrastructure - 6,000 SF
Design
$1,500,000 CJ est. value
Ventura, CA 93001

Mission Bay Elementary School
New Construction
Design
San Francisco, CA 94158

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Preconstruction and Lease-Leaseback Construction Services
Renovation
Post-Bid
$2,640,000 est. value
Gustine, CA 95322

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Shade Structure Installation
Renovation
Results
Mill Valley, CA 94941

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Pine Ridge Elementary School New Administration Building
New Construction
Conception
$3,300,000 est. value
Magalia, CA 95954

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Last Updated 08/30/2022 06:32 PM
Project Title

A New Gymnasium and Cafe for West Street Elementary School

Physical Address View project details and contacts
City, State (County) Corning, CA 96021   (Tehama County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

**Absolutely no inquiries to the Owner and Architect will be accepted at this time. Please direct all Questions and Inquiries to the General Contractor ! ** United Building Contractors, Inc. is requesting bids on the following project and would like your subcontractor bid. DUE TO FUNDING SOURCES, BIDS WILL NEED TO BE SEPARATED PER BUILDING (THREE SEPARATE BIDS) The work of the contract comprises the A New Kindergarten Classroom Wing for Corning Union Elementary School District, Tehama County, California as defined herein. Corning Union Elementary School District "Lease-Leaseback Project" for the NEW Construction of West Street Elementary Multi-Purpose, Kindergarten, & Classroom Buildings The Scope of Work will include: Concrete, Masonry, Metals, Rough Carpentry, Casework, FRP, Thermal & Moisture Protectant, Insulation, Metal Roof Panels, Siding, Modified Bituminous Membrane Roofing, Sheet Metal, Joint Sealants, Steel Doors and Frames, Wood Doors, Aluminum Storefronts, Door Hardware, Glazing, Steel Framing, Portland Cement Plastering, Gypsum Board, Tiling, Acoustical Panel Ceilings, Resilient Tile Flooring, Resinous Flooring, Tile Carpeting, Painting, Graffiti-Resistant Coatings, Visual Display Surfaces, Signage, Toilet Compartments & Accessories, Emergency Key Cabinets, Fire Protection Specialties, Roller Window Shades, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Alarm System, Playground Equipment, Earthwork, Landscaping, Paving, Striping, Chain-Link Fences & Gates, Metal Fences & Gates, Site Utilities. CONSTRUCT WORK FOR THE LEASE-LEASEBACK PROJECT REQUIRING AB566 "SKILLED & TRAINED WORKFORCE" under Education Code section 17407.5 and Public Contract Code section 2601, DIR REGISTRATION & CERTIFIED PAYROLL Mandatory Skilled & Trained Workforce requirements must be met. This is a Lease-Leaseback project. It is the Subcontractors responsibility to know the complete set of plans, to clarify and cover any missing items required to complete their scope of work. Please contact Calvin Jackson (calvinj@unitedbuildingcontractors.com) or Edgar Ibarra (edgari@unitedbuildingcontractors.com) if you plan to bid this project or have any questions by email or contact them by phone. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents