Similar Projects
Grading and Bituminous Resurfacing - TH 87
Infrastructure
Conception
$9,200,000 CJ est. value
Nevis, MN 56467

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Northwest 2022 Site Prep & Crop Tree Release
Infrastructure
Post-Bid
Backus, Bemidji, Park Rapids, Warroad, MN 56470

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

Depot Park Tennis Court Reconstruction
Infrastructure
Results
$1,134,566 CJ est. value
Park Rapids, MN 56470

High School - 2021 Bond - Park Rapids Area Schools
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Park Rapids, MN 56470

Century School - 2021 Bond - Park Raids Area Schools
Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Park Rapids, MN 56470

Road and Street Reconstruct
Infrastructure
Post-Bid
$531,640 CJ est. value
Akeley, MN 56433

230th Street and 141st Avenue Improvements
Infrastructure
Results
$853,401 CJ est. value
Arago, MN 56470

ALDI / Park Rapids
New Construction, Infrastructure - 20,664 SF
Pending Verification
$3,200,000 CJ est. value
Park Rapids, MN 56470

Road Drainage and Rain Garden Project on Beach Drive
Infrastructure
Post-Bid
$310,000 CJ est. value
Crow Wing Lake Township, MN 56467

Bituminous Mill & Overlay
Infrastructure
Results
$798,735 CJ est. value
Lake George, MN 56458

Fairwood Drive Bridge Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$1,057,882 CJ est. value
Nevis, MN 56467

Park Rapids Bus Garage
New Construction, Infrastructure
Results
$2,166,879 CJ est. value
Park Rapids, MN 56470

2023 Street and Utility Reconstruction
Infrastructure
Post-Bid
$500,000 CJ est. value
Park Rapids, MN 56470

Last Updated 05/24/2023 11:03 PM
Project Title

Itasca State Park Water Access Site Redevelopment

Physical Address View project details and contacts
City, State (County) Lake Itasca, MN 56470   (Hubbard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,755,258 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 1% (TG/ED/VO) subcontracting goal established. SUMMARY OF WORK: The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Phased construction of two bituminous parking lots. 2. Fish cleaning building, precast concrete plumbed restroom, and precast concrete vault toilet. 3. Precast marine ramps and kayak launch. 4. Site restoration. Est. Value: $ 1,755,258.00 Est. Completion Date: July 18, 2024 Project technical information is available from Trent Luger, Email: Trent.Luger@state.mn.us The Work of Project is defined by the Contract Documents and consists of the following: 1. Construct a complete water access, parking for rental business, bituminous trail, concrete sidewalk & stairs, utilities, landscaping and other Work indicated in the Contract Documents. 2. Construct fish cleaning building. 3. Install precast vault toilet. 4. Install precast restroom building including foundation, mechanical and electrical.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents