Similar Projects
Last Updated | 04/11/2023 12:12 PM |
Project Title | OSP Boiler DDC Controls |
Physical Address | View project details and contacts |
City, State (County) | Salem, OR 97310 (Marion County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $650,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents. The single point of contact is: Craig.L.Heilman (Craig.L.Heilman@doc.oregon.gov) at (503) 983-0969. For OregonBuys assistance please contact epro-support@periscopeholdings.com 888 472 9102. Item # 1: ( 909 - 24 ) OSP BOILER PLANT UPGRADES PER PLANS, DRAWING, AND SPECIFICATIONS NIGP Code: 909-24 Building Construction, Commercial and Institutional Notice: Due to the secure nature of this institution a security check is required for all planning to attend the mandatory Pre- Bid Conference. Attendees will be required to provide clearance information including, but not limited to, his or her full name, date of birth and Oregon Driver's License number. Photo identification will also be required for entry. No blue denim trousers, blue shirt or camouflage clothing of any type is allowed. Clothing with written messages, photographs or pictures and clothing that exposes the midriff, thighs, bare back or revealing neckline are not permitted (clothing with a small manufactured logo is acceptable All persons wishing to attend shall submit the security check form via email to: DOC.LEDS@doc.oregon.gov. This form is included in the Bid packet. Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: 9/29/2023 Final Completion: 10/31/2023 Liquidated damages of $1000.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $1000.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 3 of this Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $1000.00 per calendar day elapsed in excess of the Final Completion Any questions or issues that may arise regarding the Specifications, the bidding process, and/or the award process shall be directed to the Purchaser/Single Point of Contact. Name Craig.L.Heilman Phone (503) 983-0969 E-mail: Craig.L.Heilman@doc.oregon.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 04/11/2023 at 2:00 PM PT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |