Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Lookout Point Powerhouse Heat Pump Ventilation
Alteration
Design
$250,000 to $500,000 est. value
Lowell, OR 97452

Columbia City School HVAC Renovations Project
Renovation
Bidding
$500,000 CJ est. value
Columbia City, OR 97018

Vale Elementary School HVAC Upgrade - Phase II
Renovation
Sub-Bidding
$500,000 CJ est. value
Vale, OR 97918

Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems for Crater Lake National Park
Term Contract
Sub-Bidding
Crater Lake, OR 97604

HVAC Design-Build Services at Multiple Schools
Alteration
Post-Bid
Coos Bay, OR

Purchase and Replacement of the Chiller System at the Barry Fisher Building (BFB) Northwest Fisheries Science Center (MWFSC) Newport Research Station
Term Contract
Post-Bid
Newport, OR 97365

Pioneer Hall AC Replacement
Alteration
Results
$251,293 est. value
Bend, OR 97703

Air Purification System For Local Buses
Alteration
Results
Salem, OR 97301

Classroom Climate / High Lakes Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$20,189 CJ est. value
Bend, OR 97701

Classroom Climate/WE Miller Elementary- 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$367,666 CJ est. value
Bend, OR 97703

Douglas Hall HVAC Replacement Project
Renovation
Sub-Bidding
$100,000 CJ est. value
Roseburg, OR 97471

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Air Purification System For Regional Buses
Alteration
Results
Salem, OR

Classroom Climate / Kenwood Elementary - 2022 Bond - Bend-La Pine Schools
Renovation
Pending Verification
$197,862 CJ est. value
Bend, OR 97701

Last Updated 04/11/2023 12:12 PM
Project Title

OSP Boiler DDC Controls

Physical Address View project details and contacts
City, State (County) Salem, OR 97310   (Marion County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents. The single point of contact is: Craig.L.Heilman (Craig.L.Heilman@doc.oregon.gov) at (503) 983-0969. For OregonBuys assistance please contact epro-support@periscopeholdings.com 888 472 9102. Item # 1: ( 909 - 24 ) OSP BOILER PLANT UPGRADES PER PLANS, DRAWING, AND SPECIFICATIONS NIGP Code: 909-24 Building Construction, Commercial and Institutional Notice: Due to the secure nature of this institution a security check is required for all planning to attend the mandatory Pre- Bid Conference. Attendees will be required to provide clearance information including, but not limited to, his or her full name, date of birth and Oregon Driver's License number. Photo identification will also be required for entry. No blue denim trousers, blue shirt or camouflage clothing of any type is allowed. Clothing with written messages, photographs or pictures and clothing that exposes the midriff, thighs, bare back or revealing neckline are not permitted (clothing with a small manufactured logo is acceptable All persons wishing to attend shall submit the security check form via email to: DOC.LEDS@doc.oregon.gov. This form is included in the Bid packet. Project Start Date: Ten (10) Calendar Days from NOTICE TO PROCEED Substantial Completion: 9/29/2023 Final Completion: 10/31/2023 Liquidated damages of $1000.00 will apply to the contract resulting from this ITB. Failure to substantially complete the Project by the, date of Substantial Completion, as specified in the Contract, will result in damage to the State of Oregon. Moreover, failure to fully complete the Project by the date of Final Completion, as specified in the Contract, will also result in damage to the State of Oregon Since actual damage will be difficult to determine, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $1000.00 per calendar day elapsed in excess of the Substantial Completion date stated in Section 3 of this Agreement. Moreover, it is agreed that the Contractor shall pay to the State of Oregon, not as a penalty but as liquidated damages, $1000.00 per calendar day elapsed in excess of the Final Completion Any questions or issues that may arise regarding the Specifications, the bidding process, and/or the award process shall be directed to the Purchaser/Single Point of Contact. Name Craig.L.Heilman Phone (503) 983-0969 E-mail: Craig.L.Heilman@doc.oregon.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 04/11/2023 at 2:00 PM PT

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents