Similar Projects
Heritage Museum - City of Racine
Renovation
Conception
$474,000 CJ est. value
Racine, WI 53403

Replacement of Sand and Gravel Storage Building - 6217 - City of Wauwatosa
New Construction, Infrastructure
Conception
$250,000 CJ est. value
Wauwatosa, WI 53213

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$148,000,000 CJ est. value
Milwaukee, WI 53202

Store-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Menomonie - Eau Claire
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Menomonie, WI 54751

Tavern Renovations GPC
Renovation
Bidding
$950,000 CJ est. value
Eagle, WI 53119

Deppe Wagon Pavilion Mold Remediation and Improvements - MEP
Renovation
Sub-Bidding
$1,535,000 CJ est. value
Baraboo, WI 53913

RFQ Design - Construct Materials Shed Design (Minor) Tomah VAMC
New Construction, Infrastructure - 6,000 SF
Post-Bid
$1,000,000 CJ est. value
Tomah, WI 54660

Swan Park Site Redevelopment Project - Contract A and Contract B
New Construction, Renovation, Infrastructure
Post-Bid
$1,500,000 est. value
Waupaca, WI 54981

East Shop Salt Shed
New Construction
Results
Shawano, WI

Boat Shed Construction - GPC
New Construction
Results
$447,800 est. value
Campbellsport, WI 53010

Viking Electric Proposed Building
New Construction - 6,250 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Wausau, WI 54401

Sussex Highlands Site II Building A
New Construction - 150,000 SF
Construction
$16,000,000 est. value
Sussex, WI 53089

Wisconsin Historical Museum & Mixed-Use Redevelopment
Demolition, New Construction, Infrastructure - 116,097 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Last Updated 10/17/2023 10:26 AM
Project Title

Deppe Wagon Pavilion Mold Remediation and Improvements

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Museum, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $1,535,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 26, 2023, this project is in value engineering, and expected to advertise for rebidding later this year. A timeline for construction has yet to be announced. In general the work consists of upgrades for the existing Deppe Wagon Pavilion, a 30,000 SF pre- engineered metal building. The project will provide a 16,000 SF temporary storage tent to provide cover to the wagons stored in the Deppe Wagon Pavilion (wagons moved by others). Interior cleaning of visible mold will be coordinated as part of the general prime contractor's scope of work. The building will be insulated and secured with an exposed insulation liner system and ground level metal liner panel. Architectural work includes minor wall build-outs, metal panel replacements, and door replacements. The project includes a new water service to support a new sprinkler system, a heated fire protection equipment room, new ventilation and destratification fans with a DDC system, and associated electrical connection needs

Details

28,337 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents