Similar Projects
Future Truck Weigh Station - Brazoria County
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Angleton, TX 77515

Future Truck Weigh Station - Brazoria County
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Angleton, TX 77515

HEB Fuel Station
New Construction
Design
$1,200,000 est. value
Manvel, TX 77578

QuikTrip
New Construction
Design
$800,000 est. value
Texarkana, TX 75569

Advance Auto Parts #7255 / Pearland
Renovation - 8,640 SF
Bidding
$330,000 CJ est. value
Pearland, TX 77581

Take 5 Oil Change
New Construction
Post-Bid
$475,000 est. value
Palestine, TX

CarMax #6128 - Automobile Service Facility and FQC/Carwash Expansion
New Construction - 34,038 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Killeen, TX 76542

All Star Autoplex
Renovation - 11,000 SF
Construction
Palestine, TX 75801

QuikTrip #4032
New Construction - 7,318 SF
Construction
$500,000 est. value
Schertz, TX 78154

Refuel / San Antonio
New Construction, Infrastructure - 4,769 SF
Pending Verification
$1,400,000 CJ est. value
San Antonio, TX 78254

Refuel / San Antonio
New Construction, Infrastructure - 4,769 SF
Pending Verification
$1,400,000 CJ est. value
San Antonio, TX 78254

O'Reilly Auto Parts (S41) / San Antonio
New Construction, Infrastructure
Conception
$400,000 CJ est. value
San Antonio, TX 78205

Watershed Carwash-Military Drive / San Antonio
New Construction - 4,289 SF
Design
$2,500,000 est. value
San Antonio, TX 78211

Safelite AutoGlass
Renovation - 5,421 SF
Post-Bid
Bryan, TX 77801

QuikTrip #4052
New Construction
Construction
$500,000 est. value
San Antonio, TX 78275

Last Updated 05/10/2023 05:12 PM
Project Title

Valero #40538 Tank Replacement - 7-Eleven / Del Rio

Physical Address View project details and contacts
City, State (County) Del Rio, TX 78840   (Val Verde County)
Category(s) Commercial
Sub-Category(s) Gas Station, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 30, 2022, this project is in planning. An architect has been assigned. Neither ageneral contractor nor a selection method has been disclosed. Construction is estimated to start January 2024 and complete February 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

7,780 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents