Similar Projects
Last Updated | 01/03/2024 09:06 AM |
Project Title | University of Wisconsin - Madison College of Engineering Replacement Building |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53704 (Dane County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Competitive Bids |
Project Status | No longer Accepting Requests, Construction start expected July 2025 |
Bids Due | View project details and contacts |
Estimated Value | $240,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of January 3, 2024, a bid tabulation has not been released and the project has not been awarded. A timeline for award has not been confirmed. This RFP does not follow standard DFD bidding procedures. Please refer to the RFP guidelines and instructions for information on how to submit a proposal. Any questions should be directed to DOADFDMBidSubmission@wisconsin.gov Questions Due to the State May 1, 2023 at 5:00 pm CT This project demolishes the Computer Aided Engineering Facility and constructs a new and expanded replacement academic and research facility for the College of Engineering (COE) to provide flexible and modern engineering space; allow the expansion of enrollment, degrees, and program offerings; and begin recovery of the competitive edge lost by the current condition, inadequacies, and functionality of the existing facilities. It is anticipated that the new facility will be eight floors total (seven floors above grade and one floor below grade) and provide modern classrooms and instructional laboratories, research laboratories, shared collaboration and support spaces, and offices. The new space is projected to accommodate the strategic growth of undergraduate engineering students by at least a thousand (5,500 total) and graduate engineering students by at least 500 (2,000 total), increasing the number of faculty by at least 40, 13 principal investigator led research teams, and 30 additional research teams. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |