Similar Projects
Evolve Biologics Manufacturing Facility
New Construction
Conception

Evolve Biologics Manufacturing Facility
New Construction
Conception

Alcott Station
Build-Out
Design
$1,900,000 est. value
Mesquite, TX 75181

Leprino Foods Factory
New Construction - 850,000 SF
Design
$870,000,000 est. value
Lubbock, TX 79403

Purchase of Cabins, Storage Buildings, Etc
Term Contract
Post-Bid
Dallas, TX

Warehouse and Distribution Center
New Construction - 9,000 SF
Post-Bid
Gainesville, TX 76240

Titan Environmental Office Warehouse
New Construction - 36,000 SF
Results
New Caney, TX

FRAMM, Inc Building Improvements
Renovation
Design
$250,000 est. value
Houston, TX 77036

Fluorseals
Addition - 4,000 SF
Design
$120,000 est. value
Stafford, TX 77477

Worldwide Power Products Building 1
New Construction - 25,890 SF
Design
$3,760,000 est. value
Houston, TX 77041

Last Updated 07/14/2022 12:32 PM
Project Title

Severn Peanut Company - Hampton Farms Lubbock

Physical Address View project details and contacts
City, State (County) Lubbock, TX 79403   (Lubbock County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Warehouse/Storage
Contracting Method Construction Manager to Subcontract.
Project Status Construction Nearing Completion, Construction Commenced April 2022, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the project consists of a new warehouse facility addition approximately 78,000 sq. ft., a new receiving facility at 10,000 sq. ft., and a connecting corridor to their existing building approximately 15,000 sq. ft. The associated sitework will provide new vehicular access to the new receiving and shipping docks. The pre-engineered metal building and ACM panels will be by the Owner.

Details

Manufacturing/Processing Plant, 78,000 SF New Construction, Warehouse/Storage, 1,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents