Similar Projects
Corrections to Sprinkler System
Renovation, Infrastructure
Design
$500,000 to $1,000,000 est. value
Chicago, IL 60612

Install Sprinkler Systems
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Jacksonville, IL 62650

Fire Alarm and Sprinkler System Testing, Repair and Monitoring Services
Term Contract
Sub-Bidding
West Chicago, IL 60185

Fire Suppression Systems Testing and Inspections
Term Contract
Post-Bid
IL

Fire Alarm System Inspections, Testing, Maintenance
Term Contract
Post-Bid
Arlington Heights, Bridgeview, Des Plaines, Elgin, Evanston, Joliet, Markham, McHenry, Melrose Park, North Aurora, South Holland, Waukegan, IL 60542

Replace Fire Alarm and Lock Controls
Results
Less than $4,000,000 est. value
Mount Sterling, IL 62353

Unit 4 Fire Suppression Additions
Addition
Results
$80,000 est. value
Springfield, IL 62712

Purchase of Thirty (30) Complete Fire Hydrants Including Auxillary Valves and Valve Boxes
Term Contract
Sub-Bidding
Hoffman Estates, IL 60169

Annual Automatic Fire Sprinkler Testing
Term Contract
Post-Bid
Elgin, IL

Fire Alarm System Upgrades
Alteration
Results
Aurora, Naperville, IL 60540

Longfellow Fire Alarm Replacement
Renovation
Sub-Bidding
$600,000 CJ est. value
Rock Island, IL 61201

Fire Alarm Security System
Alteration
Post-Bid
Tilton, IL

New Carbon Monoxide/Smoke Detector Purchase & Installation
Alteration
Results
East Saint Louis, IL 62203

Install Fire Alarm Strobes
Term Contract
Post-Bid
North Chicago, IL

Replace Mechanical and Electrical Systems, Improve Fire Safety and Security - General
Renovation, Infrastructure, Alteration
Results
Less than $700,000 est. value
Collinsville, IL 62234

Last Updated 02/07/2023 05:33 PM
Project Title

Graham Correctional Center Sprinkler Inspection

Physical Address View project details and contacts
City, State (County) Hillsboro, IL 62049   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Procurement of one-time 5 year sprinkler system Inspection for Graham Correctional Center Is this a Small Business Set Aside Procurement: No Is there a BEP/VBP Participation Goal : No One time inspection, good for 5 years, on 3 wet sprinkler systems, 1 dry sprinkler system, 1 antifreeze system, and 1 preaction system located in Industries, X-house, and Dietary Warehouse buildings. Includes a one time inspection, good for 5 years, on internal inspection of fire department FDC check valve and replacement of any water pressure gauges. Include Refill of Antifreeze as necessary. Hydrostatic testing to put all units back into Compliance with NFPA 25 standards. Include replacement of water pressure gauges. A lift is required to complete this work. Lift rental to be included in the cost of the solution. All materials provided by the Vendor shall be new, unless otherwise stipulated, and compliant with applicable manufacturer's specifications. Replacement parts and other materials may be billed at Vendor's invoiced cost. The Vendor shall provide copies of material suppliers' invoices to verify costs.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents