Similar Projects
Construct Pump Station
New Construction
Bidding
Burkeville, VA

River Oaks Pump Station 44 Service Area Phase 2 Water and Sewer Replacement
New Construction
Bidding
Norfolk, VA 23502

Plaza Bethune Pump Station No. 519 Replacement and Force Main Rehabilitation
Post-Bid
Less than $1,773,150 est. value
Virginia Beach, VA 23456

Crozet Flow Equalization Tank and Pumping Station Upgrade
Post-Bid
Charlottesville, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Johnson Creek Wastewater Pump Station
Results
$8,067,444 est. value
Chester, VA 23836

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Installation of the Big Fork Booster Station Expansion
New Construction
Bidding
South Hill, VA

Pump Station 23 Service Area Phase 8
Post-Bid
Norfolk, VA

Construction of Arts and Conference Center Pump Station 114
Results
$1,000,000 to $2,999,999 est. value
Virginia Beach, VA 23456

Kings Trail Pump Station 234 Replacement
Post-Bid
Virginia Beach, VA

Oak Forest Pump Station Abandonment Project
Results
$959,491 est. value
Charlottesville, VA 22900

Langley School Pump Station and Force Main
Post-Bid
$3,400,000 est. value
McLean, VA 22101

Rady Park Pump Station Replacement
Results
Warrenton, VA

Construction of Lake Front Village Pump Station 309 Replacement
Post-Bid
Virginia Beach, VA 23456

Last Updated 07/20/2021 09:59 AM
Project Title

Graham Park Sewage Pumping Station and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Triangle, VA 22172   (Prince William County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all materials, equipment and labor necessary for the construction of Graham Park Sewage Pumping Station and Force Main Replacement. The work includes, but is not limited to the following: 1. Mobilization: Limited to a maximum of three percent (3%) of the total of all other items 2. Provide new polymer concrete wet well. ? Provide two (2) submersible pumps on guiderails installed in new wet well. ? Provide channel grinder on guiderails installed in new wet well. 3. Provide new valve vault, with isolation valves, check valves, magnetic flowmeter and pump-around connection. ? Provide new standby diesel generator on elevated concrete platform. 4. Provide new precast concrete Pump Control Enclosure on elevated concrete platform. ? Provide new electrical distribution, instrumentation and control equipment. 5. Demolition of existing pumping station components. 6. Provide new site fencing. 7. Site work, including paved access road, landscaping and other miscellaneous improvements. 8. Provide new 4” ductile iron/HDPE force main to replace existing force main. 9. Rehabilitation of existing force main receiving manhole. 10. Demobilization and Closeout – All work related to demobilization of project site and closeout.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents