Similar Projects
Reported | 06/05/2021 12:00 AM |
Project Title | Satellite Jail HVAC Replacement |
Physical Address | View project details and contacts |
City, State (County) | Urbana, IL 61802 (Champaign County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Completion Expected November 2021 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: 1. HVAC Bid: Project consists of removal of (4) air handling units & associated air-cooled condensing units. (4) new air handlers will be installed in same location. (2) new air cooled chillers to be located on roof. Existing boilers will be removed and replaced with high-efficiency condensing boilers. New penthouse to be constructed for new equipment. Install controls valves provided by controls contractor. 2. Controls Bid: Project consists of removal of existing pneumatic controls. Install new DDC controls on existing and new HVAC equipment. Provide control valves to HVAC contractor for installation. |
||||||||||||||||
Details |
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |