Similar Projects
Replace Mechanical Systems
Alteration
Bidding
Less than $5,000,000 est. value
Chicago Heights, IL 60411

Des Plaines City Hall AHU Replacement
Alteration
Bidding
Des Plaines, IL

L/A HVAC Testing and Balance
Post-Bid
Peoria, IL 61635

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

Hot Water Heater Replacement
Results
Rock Island, IL 61201

Replace Chiller
Results
$1,000,000 to $1,400,000 est. value
Elgin, IL 60123

HVAC Services at Altgeld Family Resource Center (AFRC)
Alteration
Bidding
Chicago, IL 60827

Insulation Repair Services for Plumbing and Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Grade School HVAC Project
Alteration
Bidding
Milford, IL

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

HVAC Maintenance
Term Contract
Results
Riverdale, IL 60827

Misc. Cooling Tower And Structural Work
Infrastructure
Bidding
Oswego, IL

D100 Fenton HS Auto Shop Exhaust Replacement
Post-Bid
Bensenville, IL 60106

Habitat for Humanity Senior Rehab Program
Results
Moline, IL 61265

Reported 06/05/2021 12:00 AM
Project Title

Satellite Jail HVAC Replacement

Physical Address View project details and contacts
City, State (County) Urbana, IL 61802   (Champaign County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: 1. HVAC Bid: Project consists of removal of (4) air handling units & associated air-cooled condensing units. (4) new air handlers will be installed in same location. (2) new air cooled chillers to be located on roof. Existing boilers will be removed and replaced with high-efficiency condensing boilers. New penthouse to be constructed for new equipment. Install controls valves provided by controls contractor. 2. Controls Bid: Project consists of removal of existing pneumatic controls. Install new DDC controls on existing and new HVAC equipment. Provide control valves to HVAC contractor for installation.

Details

Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents