Similar Projects
Rehabilitation of Runway 7-25
Infrastructure
Results
$6,000,000 est. value
Pierre, SD 57501

Terminal Apron, East Cargo Apron and West Cargo Apron Pavement Rehabilitation
Results
Sioux Falls, SD 57104

General Aviation Apron Expansion
Results
Madison, SD 57042

Rehabilitate Taxiway B from Runway 15-33 to Taxiway B5
Infrastructure
Results
$1,258,278 est. value
Sioux Falls, SD 57104

Rehabilitate Apron and Reconstruct South Hangar Taxilanes
Results
$700,000 to $800,000 est. value
Mobridge, SD 57601

Pavement Maintenance/Rehabilitation
Results
Brookings, SD 57006

Runway 21 Precision Approach Path Indicator (PAPI) Installation Project
Infrastructure
Post-Bid
Sioux Falls, SD 57104

Reported 12/21/2021 12:00 AM
Project Title

Repair Golf Taxiway

Physical Address View project details and contacts
City, State (County) SD   (Meade County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This upcoming solicitation will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the Government with a removal and replacement of PCC Pavement and warranty based on the Request for Proposal (RFP). Repair Golf Taxiway, FY22, Construction, Ellsworth AFB, SD. This is a Fully-Designed Project. Project will include the following: Remove approximately 24,500 Square Yards of an unbonded PCC Pavement section (12-inch PCC / 2-inch ACC bond breaker / 21-inch PCC) and replace with approximately 24,500 SY of 21-inch PCC pavement. New PCC pavement shall conform to 32 13 14.13 CONCRETE PAVEMENT FOR AIRFIELDS AND OTHER HEAVY-DUTY PAVEMENTS with very stringent fine and coarse aggregate deleterious materials limits unique to military airfield pavement construction, weather severity classification of severe, enforcement of evaluation and testing for Alkali-Silica Reactivity per UFGS 32 13 14.13 requirements for both fine and coarse aggregates, Air Force durability requirement that aggregate shall have a satisfactory service record in freezing and thawing of at least 5 years successful service in three concrete paving projects or aggregate with durability factor of 50 or more when subjected to freezing and thawing of specimens prepared in accordance with ASTM C 1646/C 1646M and tested in accordance with ASTM C 666/C 666M, Procedure A for aggregates not having a satisfactory demonstrable service record. Removal of approximately 2,100 Square Yards of 2-inch hot-mix asphalt pavement, 8,325 square yards of 14-inch hot-mix asphalt and replacing with 10,425 SY of 3-inch hot-mix asphalt pavement conforming to UFGS 32 12 15.13 HOT-MIX ASPHALT AIRFIELD PAVING; Associated work includes the construction of a new subdrain system; the installation of preformed and poured joint sealant; removal & replacement of taxiway edge lights and NAVAIDS; Installing a temporary displaced threshold; pavement marking; seeding and minor grading.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents