Similar Projects
Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

Grand Ridge over Bills Run - Grundy County
Infrastructure
Conception
$600,000 CJ est. value
Grand Ridge, IL 61325

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Cedar Point to Standard Water Main Extension
Infrastructure
Bidding
$400,000 CJ est. value
Cedar Point, IL 61316

Innovative Solutions and Energy Conservation Measures
Infrastructure, Alteration
Post-Bid
Mendota, IL 61342

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Realign and Reconstruct the Intersection of Commercial Street, Broadway Street, and Main Street in Marseilles
Infrastructure
Results
Marseilles, IL

Various Highways throughout District 3
Infrastructure
Results

Etna Road Mixed-Use Building
Renovation, Infrastructure
Conception
$5,000,000 CJ est. value
Ottawa, IL 61350

Asphalt Bids
Infrastructure
Bidding
$60,000 CJ est. value
Mendota, IL 61342

Rowe Street and Various
Infrastructure
Post-Bid
$8,351,000 est. value
Sheridan, IL

North Utica Drifts Reclamation Projects
Infrastructure
Results
IL

Asphalt parking lot
Infrastructure
Bidding
Utica, IL 61373

Construction of Three Hot Mix Asphalt Pavement Pads
Infrastructure
Post-Bid
$311,000 CJ est. value
Streator, IL 61364

RR-21-4821 Pavement Repairs
Infrastructure
Results

Last Updated 03/16/2023 06:33 PM
Project Title

2023 General Fund Street Program

Physical Address View project details and contacts
City, State (County) Peru, IL 61354   (La Salle County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $990,452 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 16, 2023, this project has been awarded to Universal Asphalt & Excavating, Inc. in the amount of $990,451.50. Resurfacing of roadways and reconstruction of sidewalks and curbs in the various City Wards, including HMA surface removal (20,951 SY), HMA level binder (2,628 TON) and surface (1,853 TON) replacement, concrete curb gutter removal and replacement (9,762 LF), PCC Sidewalk (4,097 SF), PCC driveway removal and replacement (739 SY), and various other related items. Bidders are advised that this Contract will be subject to the Illinois Prevailing Wage Act. IDOT pre-qualification is required. The Bid shall be accompanied by a certified check or bid bond, in the amount of five percent (5%) of the gross amount of the bid and be payable to the order of the City of Peru. Bids may be held by the City of Peru for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents