Similar Projects
The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

RFP Construction Manager - Central Wastewater Treatment Plant Expansion - CMAR Design Phase Services
Infrastructure
Bidding
$300,000 CJ est. value
Johnstown, CO 80534

Campus Improvements Michener Library Trash Enclosure
Infrastructure
Bidding
$75,000 CJ est. value
Greeley, CO 80631

Orchard and Greenwood Plaza Boulevard Intersection Improvements
Post-Bid
Greeley, CO 80112

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2020 Infrastructure Improvement Program
Results
Greeley, CO 80631

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

2022 Bond - Weld RE-4 School District
New Construction, Renovation, Infrastructure
Pending Verification
$271,000,000 CJ est. value
Greeley, CO 80631

Iron Horse Filing 3 Public Infrastructure Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Johnstown, CO 80534

State Highway 60 Waterline Replacements
Post-Bid
Johnstown, CO

Centennial Trail Improvement
Results
Kersey, CO

Last Updated 09/26/2022 10:37 AM
Project Title

Charlotte Street Improvements

Physical Address View project details and contacts
City, State (County) Johnstown, CO 80534   (Weld County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Charlotte Street Improvements include: The removal and replacement of Charlotte Street from Jay Ave to Columbine Ave including private improvements, sidewalk, curb and gutter, landscaping, and full width and depth of street paving. Storm drain with associated inlets and junctions on Charlotte Street, Jay Ave and Columbine Ave. Sanitary sewer main replacement including replacement of existing sanitary sewer service connections, and associated manholes. Water main line replacement and service connections and meter boxes. Question Acceptance Deadline 07/15/2022 02:00 PM EDT

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents