Similar Projects
Walker Lane Well Rehabilitation
Post-Bid
$385,462 est. value
Holladay, UT 84117

Headquarters Well Evaluation & Rehabilitation
Term Contract
Post-Bid

Hard Banding Services for FORGE
Results
Salt Lake City, UT

Mud Hammer Drilling Services
Results
Salt Lake City, UT

Hamilton Well Rehabilitation
Infrastructure
Post-Bid
Herriman, UT

Purchase and Deliver Well Casing for Forge
Term Contract
Results
Salt Lake City, UT

White Well 1 and 2 Abandonment Project
Infrastructure
Post-Bid
Taylorsville, UT

Well Plugging
Results
Salt Lake City, UT

700 East Well Liner Project
Infrastructure
Post-Bid
South Salt Lake, UT

21B: Lower Well No. 17 Pump Intake
Results
West Valley City, UT

Haynes Well 2R Well Cleaning Project
Alteration
Post-Bid
Magna, UT 84044

Construction Services - Riverfront Park Test Well
Infrastructure
Results
South Jordan, UT

Monroc Well and Reservoir 4 Site Improvements Project
Infrastructure
Post-Bid
Cottonwood Heights, UT 84121

Tubular Goods Inspection for Forge Well 78B-32
Infrastructure
Results
Salt Lake City, UT

2022 City Hall Well Drilling Project
Infrastructure
Post-Bid
Salt Lake City, UT

Last Updated 05/30/2022 01:01 AM
Project Title

21H: Well No.15 and 16 Chlorinators

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84119   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing and installing the facilities and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following at each location: 1. Mobilization/Demobilization. 2. Removal and preservation of existing chlorinator equipment 3. Demolition of existing piping associated with existing chlorinator 3. Installation of Microclor® Sodium Hypochlorite Generator (Pre-Ordered) 3. Installation of new water softener system (Pre-Ordered) 4. Installation of Brine Tank Float and Pressure Transducer (Pre-Ordered) 5. Installation of new water lines, brine lines, sodium hypochlorite, and hydrogen vent lines.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents