Similar Projects
Rubbish Removal Services
Bidding
Westport, CT

Snow Removal and Hauling
Post-Bid
Stratford, CT 06615

Trash and Recycling Services for 146 White Street and 71 Main Street
Post-Bid
Danbury, CT

Sludge Hauling and Disposal
Results
Shelton, CT

Grit Hauling and Disposal 2019 2022
Term Contract
Results
Shelton, CT

Refuse and Recycling Services
Post-Bid
Darien, CT

Screenings Hauling and Disposal 2019 - 2022
Term Contract
Results
Shelton, CT

Crushing Services
Post-Bid
Ridgefield, CT

Refuse & Recycling at Danbury, CT
Results
Danbury, CT 06810

Carting Services - Food Waste Pick-Up and Disposal
Post-Bid
Westport, CT

Transportation and Disposal of Wastewater Generated Screenings and Grit
Results
Stamford, CT

Rubbish Removal Services - Westport Public Schools
Term Contract
Post-Bid
Westport, CT 06880

Snow Removal for Stamford Police Headquarters
Term Contract
Results
Stamford, CT 06901

S222--VISN 1 Solid Waste and Recycling Program Services
Post-Bid

Curbside Leaf Collection
Term Contract
Results
Fairfield, CT

Reported 05/13/2020 12:00 AM
Project Title

Liquid Sludge Haulage and Disposal

Physical Address View project details and contacts
City, State (County) Stratford, CT   (Fairfield County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, tools and equipment, and all else as necessary, to perform removal, haulage and proper disposal of sludge from the Water Pollution Control Facility (WPCF) located at 105 Beacon Point Road, Stratford, CT. Bid price must include removal and haulage of liquid sludge from the WPCF and proper disposal at the Contractor’s facility, including all fuel surcharges. Approximately 10,000,000 gallons of waste material (“liquid sludge”) is shipped per year. The sludge is currently hauled in 6,500 gallon trailers. On average, five (5) trailers are shipped per day, six (6) days per week. Typical shipping schedule is Monday through Saturday, with occasional Sundays to compensate for holidays. Shipping hours are from 6:30AM to 1:30PM (last arrival) with minimum half hour window between each arrival. Contractor must identify name and location(s) of certified processing facilities as part of this contract, including all subcontractors. Contractor must identify fleet equipment including load capacities to be utilized for haulage and proper disposal of sludge.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents