Similar Projects
Reported | 05/13/2020 12:00 AM |
Project Title | Liquid Sludge Haulage and Disposal |
Physical Address | View project details and contacts |
City, State (County) | Stratford, CT (Fairfield County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Provide all labor, tools and equipment, and all else as necessary, to perform removal, haulage and proper disposal of sludge from the Water Pollution Control Facility (WPCF) located at 105 Beacon Point Road, Stratford, CT. Bid price must include removal and haulage of liquid sludge from the WPCF and proper disposal at the Contractor’s facility, including all fuel surcharges. Approximately 10,000,000 gallons of waste material (“liquid sludge”) is shipped per year. The sludge is currently hauled in 6,500 gallon trailers. On average, five (5) trailers are shipped per day, six (6) days per week. Typical shipping schedule is Monday through Saturday, with occasional Sundays to compensate for holidays. Shipping hours are from 6:30AM to 1:30PM (last arrival) with minimum half hour window between each arrival. Contractor must identify name and location(s) of certified processing facilities as part of this contract, including all subcontractors. Contractor must identify fleet equipment including load capacities to be utilized for haulage and proper disposal of sludge. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |