Similar Projects
South Harrison-Benson Connection - Village of Oswego
Infrastructure
Conception
$350,000 est. value
Oswego, IL 60543

Wolfs Crossing Road Reconstruction -Segment 2 - Douglas - Village of Oswego
Infrastructure
Conception
$5,201,300 est. value
Oswego, IL 60543

DeVille Manor Apartments
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Oswego, IL 60543

Wolfs Crossing Road Housing Development
New Construction, Infrastructure
Design
$305,000,000 CJ est. value
Oswego, IL 60543

Kendal County Building BG #2 - Office Building
New Construction, Infrastructure - 15,760 SF
Bidding
$330,000 CJ est. value
Yorkville, IL 60560

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Newark 2021 MFT Road Program
Infrastructure
Results
Newark, IL

Harvest Gate at Southbury Pod 8 - Phase 2
New Construction, Infrastructure
Pending Verification
$34,000,000 CJ est. value
Oswego, IL 60543

Wind Gate at Southbury Pod 3
New Construction, Infrastructure
Pending Verification
$22,000,000 CJ est. value
Oswego, IL 60543

Venue 1012 Parking Lot Maintenance - Village of Oswego
Infrastructure
Conception
$320,000 est. value
Oswego, IL

Engineering Services Phase III for Bristol Ridge Road Resurfacing
Infrastructure
Post-Bid
Yorkville, IL 60560

RR-21-4821 Pavement Repairs
Infrastructure
Results

Harvest Gate at Southbury Pod 8 - Phase 3
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Oswego, IL 60543

Last Updated 05/15/2023 09:09 AM
Project Title

2023 MFT Road Program

Physical Address View project details and contacts
City, State (County) Newark, IL 60541   (Kendall County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $131,444 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Village of Newark 2023 MFT Road Program consists of pavement milling, hot-mix asphalt resurfacing, sidewalk removal & replacement, incidental hot-mix asphalt surfacing, structure adjustments, restoration, traffic control, and all other ancillary work required to complete the project. Pre-Qualification: Yes

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents