Last Updated | 07/28/2022 04:03 PM |
Project Title | Chalk Point Force Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Annapolis, MD 21401 (Anne Arundel County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $449,340 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work includes the following major items: The installation of approximately 1,885 feet of new 8-inch diameter HDPE sewage force main from the Chalk Point Sewage Pumping Station (SPS) to existing upstream gravity sanitary sewer manhole #10250, removal and replacement of manhole #10250, the lining of two downstream sanitary sewer manholes, and the abandonment of the existing sanitary sewer force main. Questions regarding this Project should be directed to the Project Manager, Mr. Sunil Dewan, at 410-224-1272. The cost range for the Project is: $500,000 to $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Right Is Hereby Reserved to Reject Any or All Bids and to Waiveinformalities, as the Interests of the County May Require. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |