Similar Projects
Hickory Head Valves and Actuators
Infrastructure
Bidding
The Villages, FL 32159

Hiawassee Road Force Main Replacement at SR 408
Infrastructure
Bidding
$1,342,842 est. value
Orlando, FL 32835

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

District Water Main Replacements
Results
Less than $2,100,000 est. value
Homosassa, FL 34446

West Pensacola Street Utility Improvements
Infrastructure
Bidding
Tallahassee, FL 32318

Water and Sewer Stock Water Meters Annual Supply Contract
Term Contract
Post-Bid
Vero Beach, FL 32961

Water and Sewer Emergency Repair Services
Term Contract
Results
Miramar, FL 33025

Procurement of New Flow Meters for Water Plant
Infrastructure
Bidding
Coral Springs, FL

Parkside Water Main Replacement Project
Post-Bid
Hollywood, FL

CR846 Water Main Replacement Project
Results
Less than $345,000 est. value
Immokalee, FL 34142

PW-PB - Water Access Structures
Infrastructure
Bidding
Gulf Breeze, Pensacola Beach, FL 32561

Fire Hydrants and Accessories
Term Contract
Post-Bid
Fort Lauderdale, FL 33301

Hilochee Structure Replacement - Phase 1
Term Contract
Results
Less than $230,000 est. value
Lake Alfred, FL 33850

Last Updated 07/07/2021 10:25 AM
Project Title

SR 207 Water Main Extension - Phase 2

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL   (Saint Johns County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for this project shall include construction of approximately 11,230 LF of 24” water main. The project shall include but not be limited to installation of the water main per the Bid Plans and dewatering, ancillary work, testing, restoration, and project documentation such as as-built drawings. The project generally includes the construction of 24” DR25 PVC water main from the end of the Phase 1 project within a 30-ft utility easement adjacent to the westerly Right-of-Way (ROW) line of I-95 to the southern end of the Saint Augustine 206 Interchange LLC property for a total distance of 11,230 LF.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents