Similar Projects
Calumet Harbor Break Water Repairs
Renovation, Term Contract
Design
$1,000,000 to $5,000,000 est. value
IL

DMDF Vertical Expansion
Term Contract
Design
Chicago, IL 60617

(2,600-Ft) Resurfacing, Drainage Improvement, and Retaining Wall Construction from Nicholas Drive To Western Avenue, Also Includes Hma Milling and Paving, Pcc Pavement Removal and Placement, and Storm Sewer and Drainage Structure Installation
Infrastructure
Bidding
Des Plaines, IL

Maintenance and Service Contract for RPZ, Irrigation, Fire System and Fire Extinguisher
Infrastructure, Alteration
Bidding
Winnetka, IL

Culvert Repairs
Post-Bid
Palos Hills, IL 60465

Drinking Water Reservoir Cleaning and Inspections
Term Contract
Post-Bid
Oak Park, IL

I-20-4528 Roadway Reconstruction
Results
Less than $10,000,000 est. value
Oak Park, IL 60301

West 10th Street Storm Culvert Replacement
Results
Less than $403,825 est. value
Chicago Heights, IL 60411

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

Small Streams Maintenance
Results
Less than $4,550,000 est. value
IL

Willow Walk Subdivision Drainage Improvements
Post-Bid
Arlington Heights, IL

Roadway Reconstruction, Box Culvert Replacement, and Constructon of a Soldier Pile Retaining Wall under the I-294 Bridge
Results
Franklin Park, IL

Willow Road Outfall Improvements
Infrastructure
Post-Bid
Winnetka, IL 60093

West Bartlett Drainage Improvements
Results
Bartlett, IL

Lake Lorin Shore Stabilization
Infrastructure
Post-Bid
Orland Hills, IL 60487

Last Updated 03/02/2022 02:30 AM
Project Title

Diversion Channel - Midlothian Creek

Physical Address View project details and contacts
City, State (County) Robbins, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,582,033 to $9,187,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 1,300 feet of diversion channel, including clearing, topsoil stripping and stockpiling, excavation, soil stockpiling for Phase 2 work, sanitary sewer encasement, grading, landscaping, riprap and stone armoring, from W. 135th Street to the Cal-Sag Channel in Robbins, IL. The installation of three 42” diameter pipe culverts installed in three 54” diameter casing pipes and associated headwalls, tunneled in place under the intersection of W. 135th Street and S. Claire Blvd. in Robbins, IL. Total installed length is approximately 555 feet (approximately 185 per each of three culverts). The abandonment of existing 6”, 18”, and 36” diameter storm sewers, and installation of new 18” and 36” diameter storm sewers diverted to the proposed diversion channel, including replacement of existing and construction of new associated manholes and catch basins, and associated pavement removal and replacement, near the intersection of W. 135th Street and S. Claire Blvd. in Robbins, IL. d. The installation of a new public access to the Cal-Sag Channel, including clearing, excavation, grading, access paths, placement of rock, shore protection and plantings, and temporary isolation of the work area at the Cal-Sag Channel. e. The removal of existing and installation of new access road along the existing alignment of S. Woodlawn Ave. from W. 135th Street to the Cal-Sag Channel, including parking paved walking paths, and gravel utility access road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents