Similar Projects
Reported | 09/25/2020 12:00 AM |
Project Title | Continental Drive Improvements - Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Budd Lake, NJ 07828 (Morris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project involves improvements to Continental Drive between International Drive and the driveway of Morris Crossroads Corporate Center (3000 Continental Drive). The principal Items of Work, include but are not limited to: HMA Milling - 9,850 SY; HMA 9.5M64 Surface Course - 1,200 Tons; Reset Existing Castings - 15 Units; Reconstruction Existing Inlet - 1 Unit; Curb Piece - 16 Units; Concrete Sidewalk - 23 SY . Detectable Warning Surface - 4 SY; Concrete Curb - 125 LF; Beam Guide Rail - 75 LF; Guide Rail Terminal - 3 Units; Removal of Beam Guide Rail - 150 LF; Traffic Stripes, 4" -10,810 LF; Traffic Marking Lines, 6" - 164 LF; Traffic Marking Lines, 8" - 100 LF; Traffic Marking Lines, 24" - 178 LF; Traffic Marking Symbols - 94 SF, Loop Detector - 400 LF; and Loop Detector Cable - 400 LF. Base repair will be determined in the field after milling operations. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |