Similar Projects
Bayard Phase 2B Effluent Reuse Project
Bidding
Bayard, NM

2021 Sewer Manhole Rehabilitation A Unit
Bidding
Roswell, NM

US Highway 550 Sanitary Sewer Tie-In
Post-Bid
Aztec, NM 87410

Construction Services
Post-Bid
Bernalillo, NM 87004

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Coal Avenue Alley Sewer Line Upgrade and Improvements
Results
Gallup, NM 87301

Water Reclamation Facility Effluent Pipeline Replacement
Bidding
Bloomfield, NM 87413

2019-2020 Manhole and Valve Adjustments for Overlay Project
Term Contract
Post-Bid
Las Cruces, NM 88001

Septic Services
Term Contract
Results
Santa Fe, NM 87505

Construction Services for Isleta Amphitheater Water and Sanitary Sewer Extension
Bidding
Albuquerque, NM

Wastewater System Improvements 2019
Post-Bid
Hagerman, NM 88232

Village Sewer Line Improvement Project
Results
$6,874,096 est. value
Albuquerque, NM 87105

Installation of a New Residential Septic System
Post-Bid
Bernalillo, NM 87004

Mcdowell Road Wastewater Collection System Project Phase II
Results
Less than $291,520 est. value
Mesilla, NM 88064

Bayard Phase 2B Effluent Reuse Project
Post-Bid
Bayard, NM 88023

Last Updated 04/10/2020 01:17 PM
Project Title

West Cedar Street Sewer Line Relocation

Physical Address View project details and contacts
City, State (County) Deming, NM 88030   (Luna County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $375,000 to $425,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the relocation and replacement of approximately 2884 linear feet of an existing sanitary sewer line. The existing clay gravity sewer line which is located below Cedar Street pavement is to be abandoned in-place from Eighth Street to Copper Street. A new 8-inch SDR35 gravity sewer is to be constructed adjacent to and parallel with the south Cedar Street Right-of-Way, outside travel lanes. New sewer line will be installed and connected with existing starting, intersecting, ending, and service sanitary sewer connections. Existing sewer line and manholes will be filled and abandoned in place. In addition, project will include traffic control, contractor staking, trenching, backfilling, pavement and concrete cuts, sewer main connection, and pavement and concrete replacement. Project located on West Cedar Street, part of which serves as an off-ramp outlet from I-10, in Deming NM.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents