Similar Projects
Master Facility Plan
Demolition, Alteration
Bidding
Park Ridge, IL

Athletic Flooring at Buffalo Grove and Elk Grove High Schools. District 214
Post-Bid
Arlington Heights, IL

Library Flooring at Curie HS
Post-Bid
Chicago, IL 60632

Kitchen Floor Tile Replacement at Ogden Elementary School
Results
Chicago, IL 60610

Lincolnwood SD 74 Rutledge Hall Flooring Replacement
Results
Lincolnwood, IL

Common Area Carpet
Post-Bid
Alsip, IL

CPS Otis ES Hallway Tile Replacement
Term Contract
Results
Chicago, IL 60642

Carpet
Post-Bid
Palatine, IL

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

2021 Flooring Replacement
Post-Bid
Park Ridge, IL 60068

Hay ES Gym Floor
Alteration
Results
Chicago, IL 60651

2021 Flooring Renovations
Post-Bid
Matteson, IL 60443

Cather ES Asbestos Abatement and Flooring Replacement
Alteration
Results
Chicago, IL

ACM Removal
Post-Bid
Palos Hills, IL 60465

Furnish and Installation of Flooring
Alteration
Results
IL

Last Updated 04/19/2022 03:12 PM
Project Title

N072--Removal and Replacement of Existing Flooring

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all labor, travel, supervision, materials and necessary equipment to install Luxury Vinyl Tile (LVT) in specific areas throughout the facility of the Jesse Brown VA Medical Center in Chicago, IL. The contractor shall be responsible for the removal and recycling of existing carpeting. The contractor shall also be responsible for the preparation and installation of rubber base, ADA compliant transitions, and LVT. Work will include removal of the existing carpet and VCT (if present), floor preparation, installation of the LVT, furnish and install wall base and ADA compliant transitions. Contractor will move all office furniture, complete the removal of the old carpet & VCT (if present) and install of the new flooring prior to moving back the office furniture to the same location. All work shall be performed according to manufacturer s specifications and industry standards.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents