Similar Projects
2022 Water Street Parking Sensor Replacement
Alteration
Bidding
$75,000 est. value
Naperville, IL 60540

Blackwell Fleet Management Photovoltaic
New Construction, Infrastructure
Bidding
$300,000 est. value
West Chicago, IL 60185

Guaranteed Energy Savings
Post-Bid
Roselle, IL

Black Framing Moving Head Light Fixture With Ultra Bright White Light Led Emitting Diode Light Source
Post-Bid
Glen Ellyn, IL

BIC - SRC Generator Silencer Replacement
Results
Glen Ellyn, IL 60137

Lighting Fixtures and Components for College of DuPage MAC Belushi Hall Theatrical Stage
Results
Glen Ellyn, IL

Itasca Site Buildout - 345kV Hardening
Alteration
Bidding
Itasca, IL 60143

Generator Maintenance
Term Contract
Post-Bid
Saint Charles, IL

Well 5 Rehabilitation
Results
Less than $97,460 est. value
Winfield, IL

Procurement Services Office
Post-Bid
Naperville, IL

Emergency and Amber Lighting and Related Equipment
Results
Naperville, IL

Electrician Installation, Maintenance, Modifications and Repairs
Post-Bid
Naperville, IL

6136 Generator Maintenance
Term Contract
Results
Saint Charles, IL

LED Lighting Retrofit/Replacement
Post-Bid
Hinsdale, Willowbrook, IL 60527

2021 South Waterworks Improvements and Northwest Waterworks Pumps 1 and 3 Improvements
Results
Naperville, IL

Last Updated 04/29/2022 10:13 AM
Project Title

2022 Northeast Waterworks Phase 1 Improvements

Physical Address View project details and contacts
City, State (County) Naperville, IL   (DuPage County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide the replacement of existing standby generator, automatic transfer switch and associated cables, conduits, control and monitor system. It also includes replacing and upgrading the existing chlorination equipment and upgrading associated chlorine control system, wires, conduits and lighting fixture in the chlorine room. Removing drop ceiling and supports in chlorine room, chlorine room painting; Installation of one additional chlorine booster pump and associated piping, control in pressure adjusting station. Work also includes installation of generator and chlorine scrubber and associated outside earthwork and concrete pads.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents