Similar Projects
Last Updated | 04/29/2022 10:13 AM |
Project Title | 2022 Northeast Waterworks Phase 1 Improvements |
Physical Address | View project details and contacts |
City, State (County) | Naperville, IL (DuPage County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Electric, Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | To provide the replacement of existing standby generator, automatic transfer switch and associated cables, conduits, control and monitor system. It also includes replacing and upgrading the existing chlorination equipment and upgrading associated chlorine control system, wires, conduits and lighting fixture in the chlorine room. Removing drop ceiling and supports in chlorine room, chlorine room painting; Installation of one additional chlorine booster pump and associated piping, control in pressure adjusting station. Work also includes installation of generator and chlorine scrubber and associated outside earthwork and concrete pads. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |