Similar Projects
Bradford K-8 North Renovations - 2018 Bond -Jefferson County Public Schools
Infrastructure, Renovation
Conception
$475,000 CJ est. value
Littleton, CO 80127

Murphy Express #8635 / Louisville
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Louisville, CO 80027

Cherry Street Apartments / Fort Collins
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Fort Collins, CO 80521

RFP Construction Manager - Potts Field and Prentup
Infrastructure
Bidding
$5,500,000 CJ est. value
Boulder, CO 80303

Ramp Works - Weld County
Infrastructure
Bidding
$20,000,000 CJ est. value
Greeley, CO 80634

RFQ Contractor - Tunnel Construction Subcontractor
Infrastructure
Sub-Bidding
$9,500,000 CJ est. value
Boulder, CO 80302

RFQ Contractor - Tunnel Construction Subcontractor
Infrastructure
Sub-Bidding
$9,500,000 CJ est. value
Boulder, CO 80302

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

CM/GC Services - Broadway at I-25 Multimodal/Safety Improvements
New Construction
Results
Denver, CO

Reconstruction of City Streets at Various Locations
Results
Durango, CO

Apex Meridian Phase II
New Construction - 180,000 SF
Construction
$10,000,000 est. value
Lone Tree, CO

Mead Public Works Maintenance Facility
New Construction - 12,000 SF
Construction
Mead, CO 80542

Willits Condominium Development
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Basalt, CO 81621

All Inn Motel Renovation and Addition
New Construction, Renovation, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Denver, CO 80206

Last Updated 10/05/2022 01:35 AM
Project Title

Continental Bridge Repairs

Physical Address View project details and contacts
City, State (County) South Fork, CO 81154   (Rio Grande County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Cancelled. This project includes the repair of both abutments of Continental Reservoir Bridge as indicated on the plans, specifications, and the following requirements. This work includes the excavation of both abutments, bringing abutment backwalls back to plumb, creating an underdrainage structure within the backfill of each abutment, adding dead-men timbers to both abutments and all four wingwalls. The bridge shall be reset to its original orientation. Work also includes armoring the bridge abutment backwalls, wingwalls, and banks with riprap, the addition of four Type 2 Object Markers, and the removal and disposal of non-compliant approach railings and work as indicated in the drawings and specifications. Upon completion of construction, the bridge shall be reset such that the final location of the bridge maintains the initial location of the bridge. Optional work that may be awarded includes the replacement of any unacceptable fill material subject to approval by CO and the replacement of any decayed/rotten structural timber members making up the abutment walls and wingwalls subject to approval by the CO. The bridge is approximately 20 feet long and 16 feet wide and spans North Clear Creek and sits on a hairpin turn. PROJECT LOCATION From the town of South Fork, head west on CO-149 N for 18.3 miles, then turn left onto Deep Creek Road for 1.8 miles then continue straight onto County Road 806 for 1.2 miles, then turn left onto CO-149 North for 25.2 miles, then turn left onto Forest Service Road 513 for 1.7 miles, then turn left onto Forest Service Road 513.1A for 1.7 miles. The bridge location is on a hairpin turn below Continental Reservoir. MAGNITUDE OF CONSTRUCTION PROJECT The estimated price range of the project is between $100,000 and $250,000. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents