Similar Projects
Warehouse and Munitions Storage Facility
New Construction, Renovation - 14,000 SF
Design
$5,000,000 to $10,000,000 est. value
Fort Carson, CO 80913

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - Consolidate Cadet Preparatory School Dormitory
Demolition, New Construction, Infrastructure
Bidding
$100,000,000 CJ est. value
US Air Force, CO 80840

Fire Station Support Building
New Construction, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Fort Carson, CO 80913

RFP D/B - ADAL Fitness Center
Renovation, Addition, Demolition - 5,319 SF
Post-Bid
$25,000,000 to $100,000,000 est. value
Colorado Springs, CO 80930

Cadet Field House Phase 2
Renovation
Results
CO 80840

Construct Contract Special Operations Command - North (SOCNORTH), Theater Operational Support Facility, Peterson AFB, Colorado
Results
$45,000,000 to $55,000,000 est. value
Colorado Springs, CO 80914

Sijan Hall Dormitory
Renovation - 700,000 SF
Pending Verification
CO 80840

IDIQ MACC for Natural Gas and POL Fuel System Projects at Various Government Installations within the NAVFAC SW Area of Responsibility
Renovation
Post-Bid
$50,000 to $10,000,000 est. value

100th MDB National Guard Readiness Center
New Construction
Results
Colorado Springs, CO

Indefinite Delivery Contract (Idc) For Vertical Architectural-Engineering (A-E) Services Which Typically Support Military Design And Interagency & International Services (Iis) For U.S Army Corps Of En
New Construction
Post-Bid

Renovate Sijan Hall, Phase 1
Renovation
Post-Bid
$25,000,000 to $100,000,000 est. value
Colorado Springs, CO

Tactical Equipment Maintenance Facility, Fort Carson
New Construction, Infrastructure
Post-Bid
$25,000,000 CJ est. value
Colorado Springs, CO 80902

Installation of Carpet and Cove Base Cheyenne Mountain Space Force Station
Renovation
Post-Bid
$100,000 est. value
Colorado Springs, CO 80906

Bldg. 350 HVAC and Roof Repair
Build-out, Renovation
Post-Bid
$5,000,000 CJ est. value
Colorado Springs, CO 80914

Last Updated 02/09/2023 07:41 AM
Project Title

RFP D/B - Army Reserve National Roofing Program FY22 Task Order 21

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,385,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Feb 08, 2023 Contract Award Number: W912QR20D0014 Task/Delivery Order Number: W912QR23F0035 Contractor Awarded Unique Entity ID: ENGNYN1LJWB7 Contractor Awarded Name: AR6-CRAM ROOFING JV LLC Contractor Awarded Address: New Braunfels, TX 78132-2652 USA Base and All Options Value (Total Contract Value): $1385000.00 W912QR-21588681_NRP21-0000 MATOC W912QR20D0014 thru 0020 Dear MATOC Contractors: Reference is made to your Indefinite Delivery Contracts, Numbers W912QR20D0014 - W912QR20D0020, Design Build Multiple Award Task Order Contract (MATOC) for Building Envelope, Roof Repair and Replacement Construction in Support of U.S. Army Reserve National Roofing Program (NRP), Army, and Air Force Reserves Sections. We request you submit a price proposal for construction services required to repair roofs in Colorado; FACID C0147, as detailed in the scope of work, drawings, and specifications posted at the System for Award Management (www.SAM.gov). The documents are available for download at www.SAM.gov only. All vendors must be registered in the SAM database at SAM.gov. The RFP can be found by logging into the website as a vendor and searching for the solicitation number (W912QR-21588681). The cost range is between $1,000,000 and $5,000,000. The basis for award of this task order is lowest evaluated price (base plus all options). Your proposal should include a price breakdown and/or labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract. Proposals that fail to submit a price breakdown or fail to use the binding rates from your MATOC will not be considered. Proposals submitted in response to this RFP shall be good for no less than 90 calendar days. Award of this project is Subject to the Availability of Funds. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. Proposals are due no later than 2:00 PM ET on 2 September 2022. Submit your proposal by email to Laura.Phillips-Payne@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Laura Phillips-Payne via email at Laura.PhillipsDEPARTMENT OF THE ARMY LOUISVILLE DISTRICT, CORPS OF ENGINEERS P.O. BOX 59 LOUISVILLE, KENTUCKY 40201-0059 W912QR-21588681_NRP21-0000 Payne@usace.army.mil. Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds. All questions regarding this Request for Proposal (RFP) must be submitted via ProJNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is: (YCFIRN-6JS68M). Please see ProJNet instructions included in this RFP. System for Award Management (SAM): Your SAM registration is required to be active prior to any award. You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232- 33 Payments by Electronic Funds Transfer - System for Award Management, which indicates "All payments by the Government under this contract shall be made by electronic funds transfer (EFT)." Those not currently registered can obtain registration by going to the website www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from www. SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. If you have contractual questions, please contact Laura Phillips-Payne at Laura.PhillipsPayne@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion. Commencement, Prosecution, and Completion of Work (Apr 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use no later than 540 calendar days from Notice to Proceed. The time stated for completion shall include final cleanup of the premises. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProJNet system within three (3) calendar days prior to the closing date stated in the solicitation. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents