Last Updated 02/12/2021 02:51 PM
Project Title

CR 210 Paving Overlay Project

Physical Address View project details and contacts
City, State (County) Durango, CO 81301   (La Plata County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work scope for this Project shall include guardrail, shouldering, asphalt milling and overlay of approximately 2.2 miles of roadway on County Road 210 and the intersection at CR 210 and CR 141 (Refer to the bid schedule for actual bid quantities). The 4 inches of total asphalt is comprised of a 1.5 inch leveling course and a 2.5 inch mat. Milling will be for pavement tie-ins only. For paving and guardrail, begin at CR 212 and head west.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents