Similar Projects
Building Renovations and Sanitary Sewer Upgrades at Seasonal Housing Facility
Renovation, Alteration - 12,000 SF
Design
Nantucket, MA

Wells 1, 2, and 4R PFAS Treatment Equipment - General
Infrastructure
Bidding
$7,000,000 est. value
North Easton, MA

Well 4 Water Treatment Plant Upgrades - General Bids
Infrastructure
Bidding
$4,500,000 est. value
Maynard, MA

Wells 1, 2, And 4R Pfas Treatment - Sub Bids
Infrastructure
Sub-Bidding
$7,000,000 est. value
North Easton, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

CACO - Installation and Hookup of Well
Results
Truro, MA

Sewage Pump Replacement
Results
Less than $75,000 est. value
Haverhill, Lawrence, MA

Well Cleaning and Redevelopment Services FY 22
Infrastructure
Bidding
$100,000 est. value
Mansfield, MA

Installation and Development of One 18-Inch X 12-Inch Gravel Packed Well
Post-Bid
Less than $125,000 est. value
West Bridgewater, MA 02379

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Fire Training Academy Groundwater Pump and Treatment System Maintenance and Monitoring
Term Contract
Bidding
$60,000 est. value
Barnstable, MA 02668

Sewer Pump Station On-Call Repair & Maintenance
Post-Bid
Less than $67,300 est. value
Burlington, MA

Redevelopment of Plateau Well
Results
Less than $15,000 est. value
Hamilton, MA 01936

Well Cleaning
Post-Bid
Swansea, MA

Last Updated 03/29/2022 10:01 AM
Project Title

Cleaning & Redevelopment Of Municipal Gravel Packed Wells

Physical Address View project details and contacts
City, State (County) Fairhaven, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $32,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Clean and redevelop two (2) gravel packed wells and related pumping equipment. We are requesting a proposal to clean and redevelop both wells using the conventional chemical additive cleaning process. Additional work will require the removal, cleaning, chlorination and reinstallation or replacement of approximately four feet (4?) of discharge piping including air relief valve, check valve and spool pieces.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents