Last Updated | 02/01/2023 03:19 PM |
Project Title | RFQ- Fire Proofing and Roof Repairs |
Physical Address | View project details and contacts |
City, State (County) | Topeka, KS 66607 (Shawnee County) |
Category(s) | Government/Public |
Sub-Category(s) | Prison/Jail |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $290,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Shawnee County Department of Corrections is seeking bids to replace the fire protection over the day room ceilings of four living units of the Juvenile Detention Center facility. The current fire protection has delaminated from the ceiling structure and has become an overhead safety hazard. Scope of Work Remove acoustical drop ceiling system and current lighting fixtures. Remove /Reinstall HVAC vents as needed. It shall be the contractor's responsibility to ensure all above ceiling wiring is secured and not damaged during the project. Remove all existing fireproofing using best practices to minimize dust. Prepare surface as needed and reinstall fireproofing to meet current building codes and standards. Replace acoustical drop ceiling system to match current ceiling. Install new LED flat panel fixtures to match current fixture specs for lighting output. Because of population constraints only one living unit will be worked on at a time. When a living unit is complete and able to be repopulated we will move to the next living unit. Any required inspections shall be contractor's reasonability. A performance bond will be required for this project Background checks will be required of all onsite workers. Contractors will be required to follow current Department of Corrections protocols for Covid 19 PERFORMANCE BOND: The successful bidder shall furnish the County a performance bond in the amount equal to One Hundred Percent (100%) of the contract price as security for the faithful performance of the contract. The bond shall be with a surety company authorized to do business in the State of Kansas. Successful bidder further agrees to furnish said performance bond within ten (10) days after award of the contract. The herein stated specification shall become a part of the terms and conditions of the contract. All questions regarding this bid should be posted on the online Electronic Bid System. For problems with the online Electronic Bid System, please contact: Michele Hanshaw, Purchasing Specialist e-mail: Auditfinance@snco.us (785) 251-4039 Remove acoustical drop ceiling system and current lighting fixtures. Remove /Reinstall HVAC vents as needed. It shall be the contractor's responsibility to ensure all above ceiling wiring is secured and not damaged during the project. Remove all existing fireproofing using best practices to minimize dust. Prepare surface as needed and reinstall fireproofing to meet current building codes and standards. Replace acoustical drop ceiling system to match current ceiling. Install new LED flat panel fixtures to match current fixture specs for lighting output. Because of population constraints only one living unit will be worked on at a time. When a living unit is complete and able to be repopulated we will move to the next living unit. Any required inspections shall be contractor's reasonability. A performance bond will be required for this project Background checks will be required of all onsite workers. Contractors will be required to follow current Department of Corrections protocols for Covid 19 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |