Similar Projects
Unnamed Creek Improvements
Infrastructure
Bidding
Loves Park, IL

Gregory Heights Drainage Improvements Phase 2
Infrastructure
Bidding
Rockford, IL

Mowing Services
Term Contract
Post-Bid
South Beloit, IL

F.O.B. Co./Twp. Yard: Var. Pipe Culverts, Connect Bands, End Sections
Post-Bid
IL

Clayton Street Drainage and Overlay
Results
Less than $61,857 est. value
Cherry Valley, IL 61016

Rehabilitate Air Cargo Apron Trench Drain (Ramp A and C)
Results
New Milford, IL 61109

Statewide Natural Areas Management
Term Contract
Post-Bid

East Riverside Boulevard Culvert Repair
Results
Loves Park, IL 61111

The Knoxville United Methodist Church Lawn Care
Post-Bid
Knoxville, IL 61448

Regional Detention Improvements
Results
Less than $63,527 est. value
Cherry Valley, IL 61016

Devon Avenue and Thomas Drive Drainage Improvements
Alteration
Post-Bid
Loves Park, IL

South Bell School Road Drainage Repairs
Results
Less than $46,502 est. value
Cherry Valley, IL 61016

Harrison Avenue Box Culvert Repairs 2021
Infrastructure
Post-Bid
Cherry Valley, IL 61016

Gregory Heights Drainage Improvements Phase 1
Results
Less than $538,328 est. value
Rockford, IL 61104

City Hall Sidewalks, ADA, and Drainage Improvements
Results
Less than $76,000 est. value
Rockford, IL

Last Updated 08/05/2021 03:34 PM
Project Title

Auburn Street CCDD Facility

Physical Address View project details and contacts
City, State (County) Rockford, IL 61105   (Winnebago County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1,250 LF Erosion Control Barrier; 10,900 SY Erosion Control Blanket; 4,100 CY Earth Excavation; Seeding and Restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents