Similar Projects
Monterra Phase 2
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Whitefish, MT 59937

Coram 200,000 Gallon Water Storage Tank
Infrastructure
Bidding
$895,000 CJ est. value
Coram, MT 59912

Coram 200,000 Gallon Water Storage Tank
Infrastructure
Bidding
$895,000 CJ est. value
Coram, MT 59912

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Mill/Fill Overlay MT HWY 40 Kalispell Area
Alteration
Post-Bid
Kalispell, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Hudson Bay Divide South
Infrastructure
Results

Taco Bell Remodel - East Idaho Street / Kalispell
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Kalispell, MT 59901

Taco Bell Remodel - East Idaho Street / Kalispell
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Kalispell, MT 59901

Swan Lake District Office Entrance Bridge Replacement
Infrastructure, Renovation
Bidding
$250,000 CJ est. value
Bigfork, MT 59911

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Existing Surface and Provide a New Plant Mix Surface
Infrastructure
Results
MT

2022 Lion Mountain Overlay Project
Infrastructure
Bidding
$315,000 CJ est. value
Whitefish, MT 59937

Whitefish Lake State Park Chip Seal
Infrastructure
Post-Bid
$43,000 est. value
Whitefish, MT

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Results
West Glacier, MT 59936

Last Updated 08/12/2022 08:31 PM
Project Title

Overlay and Reconstruction Project

Physical Address View project details and contacts
City, State (County) Columbia Falls, MT 59912   (Flathead County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to several City streets in Columbia Falls including Beth Road, Martha Road, 1st St EN, Vans Ave, 13th St W, and 1st Ave W and includes the following major items: clearing, grubbing, and topsoil removal; asphalt pavement removal; asphalt pavement milling; earthwork, grading, and compaction; crushed base; new asphalt surfacing; concrete sidewalk; concrete curb and gutter; concrete dry well structures; signage and pavement markings; traffic control; and topsoil placement and seeding.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents