Similar Projects
HVCAR Services for Marta`s Headquarters Complex
Bidding
Atlanta, GA 30324

Countywide Spot Cooler and Heat Pump
Alteration
Bidding
GA

Prequalified Contractors List
Post-Bid
East Point, GA

HVAC Air Filters and Related Supplies
Term Contract
Post-Bid
Atlanta, GA 30303

Multi-Site HVAC Rooftop and PTAC Unit Replacement
Results
Atlanta, GA 30324

Replace 1st and 2nd Floor HVAC Units, Clarkston Campus, Bldg
Results
Atlanta, GA 30302

Clarkston Campus CD Building Install Screw Chiller and Replace AHU Cooling Coil
Post-Bid
Less than $910,000 est. value
Atlanta, GA 30302

Mechanical Contractor Services - Decatur Campus Building SB Replace Air-Cooled Condensers and AHU DX Cooling Coils
Results
Less than $980,000 est. value
Atlanta, GA 30302

City Hall HVAC Purification System
Post-Bid
Alpharetta, GA 30009

Design of Replacement Air Handling Unit
Results
Less than $1,400,000 est. value
Atlanta, GA 30313

Rialto and Haas-Howell HVAC Upgrades
Post-Bid
Less than $850,000 est. value
Atlanta, GA 30302

GT Campus Recreation Center Chiller Replacement
Results
Atlanta, GA 30318

HVAC and Mechanical Products
Term Contract
Post-Bid

Kitchen Exhaust System Maintenance Services
Term Contract
Results
Less than $12,000 est. value
GA

Replace Boiler and Cooling Tower at Douglass High School
Post-Bid
Atlanta, GA 30318

Last Updated 06/14/2021 04:50 PM
Project Title

Flanged Inline Air Heater With Controller

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $365,750
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supply a new flanged inline air heater for increasing the temperature of processed air from 900°F to 1550°F at a pressure of 750psig and flow rate of 2lbs/sec. The heater must include a control limit. This heater will be used to supply air to various combustion and fluid mechanics experiments.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents