Similar Projects
Spalding Village
New Construction, Infrastructure - 156,300 SF
Conception
$50,000,000 CJ est. value
Griffin, GA 30224

2022 Tsplost Sidewalk Improvement Program Carver Road Sidewalk
Infrastructure
Bidding
$490,000 CJ est. value
Griffin, GA 30224

2022 Tsplost Sidewalk Improvement Program Carver Road Sidewalk
Infrastructure
Bidding
$490,000 CJ est. value
Griffin, GA 30224

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Dundee Mills Village Sewer Improvements - Phase II
Infrastructure
Post-Bid
$700,000 CJ est. value
Griffin, GA 30224

TSPLOST Resurfacing Phase I
Infrastructure
Results
GA

Wallace Road Warehouse
New Construction, Infrastructure - 100,000 SF
Pending Verification
$5,000,000 CJ est. value
Griffin, GA 30223

Janet Street Industrial Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Griffin, GA 30224

TSPLOST Resurfacing Phase IA
Infrastructure
Post-Bid
$400,000 CJ est. value
Griffin, GA 30223

Tomochichi Road Industrial Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Griffin, GA 30223

T32-D3-Pavement Preservation and Maintenance Services - Spalding SR 16-141642-2
Infrastructure
Post-Bid
$900,000 CJ est. value
Griffin, GA 30224

Water Main Relocation on S.R. 16 at Flint River Bridge
Infrastructure
Post-Bid
$100,000 CJ est. value
Griffin, GA 30224

Commerce Drive Development the Lakes at Green Valley (Lot P)
Infrastructure
Post-Bid
$300,000 CJ est. value
Griffin, GA 30224

Village MD / Griffin
New Construction, Infrastructure - 20,000 SF
Post-Bid
$12,000,000 CJ est. value
Griffin, GA 30223

Transfer Station/Recycling Center/Shoal Creek C and D Landfill Paving Projects
Infrastructure
Post-Bid
$420,000 CJ est. value
Griffin, GA 30224

Last Updated 09/08/2023 08:08 AM
Project Title

Renovations to the Heritage Park Gymnasium

Physical Address View project details and contacts
City, State (County) Griffin, GA 30224   (Spalding County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Fitness Center, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The approximate extent and character of the Work is generally described as follows: The project consists of but is not limited to the Renovation of the 7,972 SQ FT. Heritage Park Gymnasium and includes selective site demolition, new utilities with connections to municipal services, new grading/drainage, new storm sewer systems, new concrete sidewalks, selective demolition of building components, new foundations, new slab on grade, new load bearing CMU/Structural Steel/Cold Formed Steel Roof Framing, new metal framed stairs, pointing/repair/painting of existing masonry veneers, new exterior window/door systems, new roof/fascia/eave systems, new building insulation, new interior CMU walls, new interior floor/base/wall/ceiling finishes, new, new interior architectural millwork, new interior doors, new interior accessories/equipment, new plumbing fixture/piping systems, new HVAC/ductwork systems, new primary/secondary/general electrical distribution systems, new lighting systems and fire alarm devices/systems. The time allowed for Substantial Completion is 360 days, and the time allowed for completion and readiness for final payment is 390 days from the date of commencement. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashier's check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise. *Plans and specifications are for viewing purposes only. All contractors must contact Paragon Consulting Group to purchase an official set.*

Details

7,972 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents