Similar Projects
Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity Multiple Award Construction Contract for Jacksonville/Mayport/Orlando Areas N69450-20-R-0012
New Construction, Renovation, Demolition
Design
$150,000 to $99,000,000 est. value
Jacksonville, Mayport, Orlando, FL

Design-Build and Design-Bid-Build Indefinite-Delivery/Indefinite Quantity Multiple Award Construction Contract for Jacksonville/Mayport/Orlando Areas N69450-20-R-0012
New Construction, Renovation, Demolition
Design
$150,000 to $99,000,000 est. value
Jacksonville, Mayport, Orlando, FL

Eglin, AFB Munitions Maint. Facility & Igloos
New Construction
Bidding
Eglin AFB, FL

Airey and Tyndall Gate Complexes, Tyndall AFB, Florida
Post-Bid
$25,000,000 to $100,000,000 est. value
Panama City, FL 32403

Army Reserve Center in Panama City, Florida
Addition - 5,532 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Panama City, FL

Modify Control Rooms Building 380
Renovation
Results
$5,000,000 to $10,000,000 est. value
Eglin AFB, FL 32542

Consolidated Gulf Range Operations Center Facility/Consolidated Telemetry Range Operations Center Facility, Eglin Air Force Base, Florida
New Construction
Results
Eglin AFB, FL 32542

Repair Command Post, Bldg 90208
Construction
$1,000,000 to $5,000,000 est. value
Hurlburt Field, FL 32544

KC-135 Beddown Add Flight Simulator Training, Macdill AFB, FL (Hillsborough County)
Renovation, Addition - 5,338 SF
Construction
Tampa, FL

Design and Construction of Zone 3 - WEG HQ, Maintenance Hangar, and Apron Facilities
New Construction - 209,697 SF
Design

(Idiq) (Satoc) For Design-Build and Construction, Continental United States (Conus) Projects Related To General Construction
Post-Bid
$1,000,000 to $3,000,000 est. value
Moore Haven, Port Mayaca, FL

SOF Combined Squad Operations Facility
New Construction - 39,500 SF
Results
$10,000,000 to $25,000,000 est. value
Hurlburt Field, FL 32544

Design-Build Services - Ready Building Addition/Alteration
Renovation, Addition - 17,200 SF
Construction
Less than $3,000,000 est. value
FL 32091

W9127820R0048 - Two-Phase Design Build Zone 8 Indoor Firing Range and Combat Arms Training and Maintenance (CATM) Facility, Tyndall, AFB, FL
New Construction - 20,560 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Tyndall AFB, FL

Aircraft Maintenance Unit (AMU) and Weapons Hangar
New Construction, Demolition - 105,041 SF
Post-Bid
$25,000,000 est. value
Hurlburt Field, FL

Last Updated 04/09/2020 02:00 PM
Project Title

Renovate Barracks Buildings 2016 and 2014

Physical Address View project details and contacts
City, State (County) Starke, FL   (Bradford County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $248,830
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Barracks 2016 and 2014, inspect and repair soffit, fascia and drip edge as necessary. Install 4"x 36" high split face concrete block wainscot with associated foundation and cap around perimeter of building. Clean and prepare existing block walls for wainscot and stucco. Remove siding and fur wall out even with adjacent concrete block as necessary and install pressure treated sheathing with appropriate waterproof membrane and wire lath to receive stucco. Install stucco from top of new cap to soffit. Replace all exterior doors with Solid Core Steel doors and new Best Lever Handle Hardware and Cores per CBJTC criteria. Remove existing screen doors and fill in hinge recesses on frame prior to paint. Replace all windows with new vinyl framed, fixed, insulated, low-e windows. Install flashing under windows over the precast cap. Inspect all exterior mechanical equipment and service/repair/replace as necessary. Color scheme to match building #2023.Remove monitor/clerestory roof and furnish and install new 24 gauge standing seam metal roof system over new Grace Ice and Water Shield or equivalent. Approved vendors for metal roof system: Gulf Coast Supply - Gulfseam Hidden screw metal roof systems or Berridge Manufacturing Co - Cee-Lock. Finish Kynar 500 Finish with Sierra Tan color 16 1/2" with Striation. Furnish and install new eve drip, color to match roofing. Furnish and install spray foam insulation to the bottom of the roof deck, minimum R30 or higher. Install 1 5/8" metal framing on inside of exterior walls. Install 1 1/2" rigid foam insulation, and 5/8" GWB. Finish will be level 5. Extend all data, power outlets and switches flush with new GWB. Patch ceiling as needed. Furnish and apply new ceiling paint and interior wall paint. Remove all flooring (VCT) and patch all cracks in slab and seal concrete slab. Furnish and install new Hollow Core Steel doors and frames at both interior door locations. Provide lockset in accordance with CBJTC design criteria. Furnish and install new solid surface window sills, to be approved by CBJTC. Furnish and install 2" white plastic window blinds. All colors, materials and mechanical specifications will be approved by the owner.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents