Similar Projects
Administration Office HVAC Replacement
Alteration
Bidding
Fayetteville, NC 28306

HVAC Preventative Maintenance
Alteration
Bidding
Fayetteville, Hope Mills, Spring Lake, NC 28306

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Anne Chesnutt Middle School and Morganton Road Elementary School, HVAC Infrastructure
Results
Fayetteville, NC 28303

Morganton Road Elementary School, Kitchen HVAC Addition and Building F HVAC Unit Replacement
Results
Fayetteville, NC 28303

Mary McArthur Elementary School, HVAC and Glazing Replacement
Alteration
Bidding
Fayetteville, NC 28304

Garage Air System Repair
Alteration
Post-Bid
Fayetteville, NC

Benjamin Martin Elementary School and Ponderosa Elementary School Kitchen HVAC Additions
Results
Fayetteville, NC 28303

Cooling Tower, Boiler Loop, and Chilled Water Loop Water Treatment
Alteration
Bidding
Fayetteville, NC 28301

EE Smith Science Class Rooms AC Replacement
Alteration
Post-Bid
Fayetteville, NC 28301

Bay & Hangar Door Maintenance, Repair, and Replacement (Fort Bragg, NC)
Results
Fort Bragg, NC 28310

Detention Center Boiler Replacement
Alteration
Bidding
Fayetteville, NC

College Lakes Package AC Replacements for Buildings 2,3 and 5
Alteration
Post-Bid
Fayetteville, NC 28311

South View High School Admin A/C Replacement
Results
Hope Mills, NC 28348

Last Updated 02/23/2022 09:06 AM
Project Title

Rockfish Elementary School HVAC and Window Replacement

Physical Address View project details and contacts
City, State (County) Hope Mills, NC 28348   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of replacing a variety of DX HVAC equipment including wall mounted heat pumps, packaged rooftop units, and split system units on campus. Existing single pane windows in Buildings 1, 2, and 3 shall be replaced with new.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents