Similar Projects
AutoZone #1935 / Rutland
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Proctor, VT 05765

Sand Hill Road Assisted-Living Facility
New Construction, Infrastructure - 94,000 SF
Design
$23,000,000 CJ est. value
Castleton, VT 05735

Rutland City Main Street Park Project 2023
Infrastructure
Bidding
$350,000 CJ est. value
Rutland, VT 05701

Insulating Storage Garage
Term Contract
Post-Bid
Rutland, VT

Two Paving Projects
Infrastructure
Post-Bid
$200,000 CJ est. value
Goshen, VT 05733

New Public Safety Building - City of Rutland
New Construction, Infrastructure
Results
$5,462,000 CJ est. value
Rutland, VT 05701

GMNF FR10-10.4 Culvert Replacement
Infrastructure
Design
$500,000 CJ est. value
Mount Tabor, VT 05739

Castleton
Infrastructure
Post-Bid
Castleton, VT 05777

Rutland Creek Path Segment 3
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Rutland, VT 05701

Forest Road 10 Culvert Replacement Green Mountain National Forest
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Wallingford, VT 05773

Grove Street Culvert Replacement
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Rutland, VT 05701

Hubbardton STP 0161 (32)
Infrastructure
Post-Bid
$375,000 CJ est. value
Hubbardton, VT 05735

Construction of The Killington Water Transmission Mains Contract 3B
Infrastructure
Post-Bid
$20,000,000 CJ est. value
Killington, VT 05751

Robbins Street Sidewalk 2023
Infrastructure
Post-Bid
$200,000 CJ est. value
Rutland, VT 05701

East Center Street Concrete Sidewalk
Infrastructure
Post-Bid
$200,000 CJ est. value
Rutland, VT 05701

Last Updated 05/15/2023 07:14 PM
Project Title

Water Transmission Mains Storage Tank To Killington Road Contract 3B

Physical Address View project details and contacts
City, State (County) Killington, VT 05751   (Rutland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,294,720 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The EPA goal for use of Disadvantaged Business Enterprises (DBE) is 8%. Current DBE Fair Share Objective/Goal of his contract has a negotiated Fair Share Objectives and Goals for DBE utilization of: 1.18% Minority Business Enterprises (MBE) and 3.66% Woman Business Enterprises(WBE) The Project consists of approximately 6,000 lf of 16" diameter ductile iron water transmission main. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. The Issuing Office for the Bidding Documents is: Copy World LLC., 5 Airport Road, Colonial Plaza- Unit 21, West Lebanon, NH 03784; Contact: 603-790-8357, bill@copyworldllc.com. Partial sets of Bidding Documents will not be available from the Issuing Office. Upon request, Bidding Documents in PDF format will be provided to prospective Bidders who have purchased printed Bid Document. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bidding Documents also may be examined at the office of the Engineer, Dufresne Group, 56 Main Street, Suite 200, Springfield, VT 05156, on Mondays through Fridays between the hours of 8:00 AM and 5:00 PM. This project is funded in part through the Vermont Drinking Water State Revolving Fund. Consequently, the following provisions apply to this WORK. More detail for each of these provisions can be found in Instruction to Bidders. BABA Act requirements do not apply. 1. Bid security in accordance with the Instructions to Bidders 2. Disadvantaged Business Enterprise (DBE) requirements 3. Performance BOND and Payment BOND each in the amount of 100% of the contract price 4. "AIS" (American Iron and Steel) Provisions of P.L. 113-76, Consolidated Appropriations Act 5. Federal Wages as determined under the Davis-Bacon Act

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents