Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Reconstruct Curb Ramps and Cold Plane Pavement With RHMA
Infrastructure
Bidding
$11,500,000 CJ est. value
Laguna Beach, CA 92651

Reconstruct Curb Ramps and Cold Plane Pavement With RHMA
Infrastructure
Bidding
$11,500,000 CJ est. value
Laguna Beach, CA 92651

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Results
$16,200,000 est. value
CA

San Clemente Campground Asphalt Repairs
Infrastructure
Results
$20,000 est. value
San Clemente, CA 92672

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

FY 2020/2021 Annual Roadway Resurfacing Project
Alteration
Post-Bid
Dana Point, CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

Prospect and Spring Right Turn Lane Modification
Term Contract
Post-Bid
Orange, CA 92869

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Arterial Sidewalk Removal and Replacement at Various Locations Phase Six
Infrastructure
Post-Bid
$350,000 est. value
Anaheim, CA

Last Updated 11/17/2022 06:35 PM
Project Title

Pavement Management Plan Project (Northbound Moulton Parkway Between Calle Cortez and via Campo Verde)

Physical Address View project details and contacts
City, State (County) Laguna Woods, CA 92637   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $275,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done includes, but is not limited to, asphalt concrete pavement cold milling and repaving. The work also includes traffic control, adjusting utility manholes and water valves to grade, re-establishing survey monuments, painting striping and legends, and applying pavement markings. The City of Laguna Woods is requesting bids from qualified bidders - including Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantaged Business Enterprise (DBE), Disabled Veterans Business Enterprise (DVBE), Small Business Enterprise (SBE) and Section 3 license contractors and suppliers - for its "Pavement Management Plan Project (Northbound Moulton Parkway Between Calle Cortez and Via Campo Verde)." The Contractor must have an A - General Engineering Contractor License in good standing at time of contract award and maintain such in full force and effect for the entire duration of the Contract. No award will be made to a contractor who has not been licensed in accordance with the provisions of the California Business and Professions Code. Prevailing Wage Requirements - In accordance with the provisions of Section 1770 et seq., of the Labor Code, the Director of Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all persons employed on the project by the Contractor sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770,1773,1773.1" Department of Industrial Relations Registration Requirement - No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No bid will be considered unless it is made on a proposal form furnished by the City of Laguna Woods. All proposals and bids shall be accompanied by cash, a certified bank draft, or a bond, from an accredited surety company, all clearly payable to the City of Laguna Woods for an amount not less than 10% of the bid submitted. The bid security will be declared forfeited if the successful bidder refuses or fails to enter into a contract within 10 days following receipt of the Notice of Award with the contract documents. The successful bidder is required to furnish a Labor and Materials Bond in an amount that is one hundred (100%) of the contract and a Faithful Performance Bond in an amount equal to 100% of the contract; the bonds to be secured by a surety company or surety companies satisfactory to the City Attorney of the City of Laguna Woods. The complete bid proposal package must be submitted to Laguna Woods City Hall as required in the Plans, Specifications and Proposal Bid forms for this project and shall be enclosed in a sealed envelope reading on the outside: OFFICIAL BID - DO NOT OPEN Project Name: Pavement Management Plan Project (Northbound Moulton Parkway between Calle Cortez and Via Campo Verde) it is the intention of the City to comply with the Americans with Disabilities Act. If you need assistance to participate in the bid opening, please contact either the City Clerk's Office at (949) 639-0500/TTY (949) 639-0535 or the California Relay Service at (800) 735-2929/TTY (800) 735-2922. The City requests at least two business days' notice in order to effectively facilitate the provision of reasonable accommodations. Contact: April Baumgarten, Maintenance Programs Analyst, (949) 639 The work to be done includes, but is not limited to, asphalt concrete pavement cold milling and repaving. The work also includes traffic control, adjusting utility manholes and water valves to grade, re-establishing survey monuments, painting striping and legends, and applying pavement markings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents