Similar Projects
Light Fixtures, Poles, and Anchor Bases - Pleasant Park
Alteration
Bidding
Apex, NC

Primary Cable 1 AI and 750 MCM AL
Alteration
Bidding
Fayetteville, NC 28301

Auditorium Lighting
Post-Bid
Bolivia, NC 28422

Generator Maintenance and Annual Load Bank
Term Contract
Post-Bid
Raleigh, NC

Construction Manager at Risk - Electrical Distribution Upgrade Project
Results
Less than $58,800,000 est. value
Raleigh, NC 27695

2018 Water System Improvements Phase 2 Contract Number 4 Water System Backup Generators
Results
$403,050 est. value
Lucama, NC 27851

Pump and Motor Repair Services
Alteration
Post-Bid
Charlotte, NC

Park Transformer Replacement Project
Results
Raleigh, NC 27615

Replacement of 120 VRLA batteries in 3 separate battery cabinets and system capacitors for a Liebert UPS model number 38BP120XRX1BNS
Term Contract
Post-Bid

Replace Control Panel on ATS
Results
$25,000 to $100,000 est. value
Cherry Point, NC

Substation T
Infrastructure
Post-Bid
Concord, NC

Residential Electrical Services
Alteration
Results
Concord, NC

XFMR Transformer 832
Alteration
Post-Bid
High Point, NC

Preventative Maintenance for Generators
Term Contract
Results
Apex, Asheboro, Asheville, Bayboro, Black Mountain, Blanch, Bunn, Burgaw, Butner, Clinton, Columbia, Dallas, Elizabeth City, Goldsboro, Greenville, Hillsborough, Hoffman, Hookerton, Kinston, Laurinburg, Lenoir, Lexington, Lillington, Lincolnton, Lumberton, Manson, Marion, Maury, Morganton, Nashville, New London, Newport, Newton, Polkton, Raleigh, Rocky Mount, Salisbury, Sanford, Siler City, Smithfield, Spruce Pine, Tabor City, Troy, Vanceboro, Whiteville, Wilmington, Windsor, Winston-Salem, NC 27983

South Church Street Stormwater Improvements
Infrastructure
Post-Bid
Waxhaw, NC 28173

Reported 05/27/2022 12:00 AM
Project Title

Underground Primary Replacement

Physical Address View project details and contacts
City, State (County) Wilson, NC   (Wilson County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022, Construction Completion Expected May 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Performing underground primary replacement in two neighborhoods. Perform underground primary replacement in designated areas on a lump-sum basis. The Millbrook subdivision to be replaced has approximately 12,111 circuit feet. The section of the Country Club subdivision to be replaced has approximately 12,163 circuit feet. There is a possibility to have more than one awarded contractor based on price and other factors listed in this RFP. (Maps of the subdivisions are available upon request.)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 26 - Electrical.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents