Similar Projects
Z1da--635-22-148 Correct Research Ventilation System (Va-21-00026378)
Design
Oklahoma City, OK 73104

Annex Building HVAC Replacement
Alteration
Bidding
Oklahoma City, OK 73117

Carl Albert State College HVAC Project
Alteration
Bidding
Poteau, Sallisaw, OK 74953

Z2da--(Con) 635 - Oklahoma City Vamc Replace Lawton Outpatient Clinic Air Cool Chiller (Va-21-00046407)
Post-Bid
$250,000 to $500,000 est. value
Fort Sill, Oklahoma City, OK 73503

Z2da--(Con) 635 - Oklahoma City Vamc Replace Lawton Outpatient Clinic Air Cool Chiller (Va-21-00046407)
Post-Bid
$250,000 to $500,000 est. value
Fort Sill, Oklahoma City, OK 73503

HVAC Maintenance and Repair Project
Results
$200,000 est. value
Oklahoma City, OK

Guthrie GUES and JR High Gym HVAC Renovation
Results
Guthrie, OK

Heat Air - Conditioning Services
Alteration
Bidding
Shawnee, OK

HVAC Services
Post-Bid
Lawton, OK 73501

HVAC Scheduled Service
Alteration
Results
Kingfisher, OK

Gym HVAC Project
Alteration
Bidding
Vian, OK

HVAC Systems Water Treatment Program
Alteration
Post-Bid
Oklahoma City, OK

Purchase and Installation of Overhead Fan
Alteration
Results
$15,900 est. value
McAlester, OK

Registry Building - HVAC Controls Upgrade Mike Monroney Aeronautical Center
Alteration
Bidding
Oklahoma City, OK 73169

H141--HVAC systems Software Building Main
Term Contract
Post-Bid
Muskogee, OK

Last Updated 10/06/2021 03:44 PM
Project Title

Cleaning of HVAC System SPRO

Physical Address View project details and contacts
City, State (County) Anadarko, OK 73001   (Caddo County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Indian Small Business Economic Enterprise (ISBEE) Set-Aside (specific to Department of Interior). Scope of Work for this project will include cleaning of all HVAC ductwork and accessories and assessment of the HVAC system at the WCD/ BIA Southern Plains Regional Office building. The extent of ductwork to be cleaned shall be determined by review of available construction documents and field verification. The contractor shall be responsible for the removal of visible contaminants, deposits, and debris from within the HVAC system in strict accordance with these specifications. The HVAC system includes any interior surface of the facility’s air distribution system for conditioned spaces and/or occupied zones. This includes all Heating, Ventilating and Air Conditioning systems from the points where the air enters the system to the points where the air is discharged from the system. The return air grilles, return air ducts to the air handling unit (AHU), interior surfaces of the AHU, mixing box, coil compartment, condensate drain pans, supply air ducts, fans, fan housing, fan blades, turning vanes, filters, filter housings, reheat coils, and supply diffusers are all considered part of the HVAC system. The HVAC system may also include other components such as dedicated exhaust and ventilation components and make-up air systems. The supply and return air ducts in ceiling, wall, floor, and ceiling vents will need to be thoroughly cleaned. All dust, visible surface contamination, and debris shall be removed. Supply and return air duct work will be inspected Contractor will cover electronic equipment with plastic covers prior to starting work. Each room will be labeled in some way to show that the vents and ducts have been cleaned and cleared of debris. Contractor will perform an assessment/evaluation of building HVAC system and implement corrective measures to improve ventilation, maintain the comfort level of the building occupants, and prevent the spread of COVID-19 in buildings per CDC, ASHRAE, and OSHA guidance. HVAC system mitigation strategies shall be evaluated by a qualified TAB firm, Cx [commissioning] provider or design professional to ensure that the modifications for pandemic safety do not create additional issues.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents