Similar Projects
Montgomery Run Bridge
Infrastructure
Conception
$1,724,577 CJ est. value
Curwensville, PA 16833

SR 4009 Conrail Bridge
Infrastructure
Conception
$2,572,889 CJ est. value
Dubois, PA 15801

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

Group 2-23-ST2
Infrastructure
Bidding
$5,000,000 CJ est. value
Clearfield, PA 16830

Tyler Avenue Pipe Culvert Replacement
Infrastructure
Bidding
$100,000 CJ est. value
Clearfield, PA 16830

Pavilion
Infrastructure
Post-Bid
$400,000 CJ est. value
Karthaus, PA 16845

T-684, T-695, T-971, T-972, T-973 - Milling of Bituminous Paving, Warm Mix Asphalt (WMA) Binder Course
Infrastructure
Post-Bid
$300,000 CJ est. value
Morrisdale, PA 16858

AMR Muddy Run East, Gulich Township, Clearfield County
Infrastructure
Results
$200,000 to $299,999 est. value
PA

Milling of Bituminous Paving
Infrastructure
Results
$217,672 CJ est. value
Clearfield, PA 16830

KeyState Natural Gas Synthesis Plant
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Pottersdale, PA 16871

Section 7-F Sanitary Sewer Project
Infrastructure
Pending Verification
$300,000 CJ est. value
Treasure Lake, PA 15801

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Smoke Run to Ramey Saddle Replacement Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Houtzdale, PA 16651

Last Updated 03/14/2023 04:14 PM
Project Title

Aquifer Recharging Well and Monitoring Wells Project

Physical Address View project details and contacts
City, State (County) Houtzdale, PA 16651   (Clearfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Aquifer Recharging Well and Monitoring Wells Project The Project includes the following Work: Conversion of one (1) or more monitoring wells or drilling of one (1) or more new sites as an Aquifier Recharging Well and five (5) shallow monitoring wells are planned. All wells are to be developed and tested for yield under controlled conditions. Bids are requested for the following Contract: Contract No. 23-01: General Construction Aquifer Recharging Well and Monitoring Wells. CLARIFICATION DEADLINE 2/28/2023 4:00 PM Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. All questions about the meaning or intent of the Bidding Documents are to be submitted electronically. Telephone inquiries are unacceptable. Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project, and will be required to submit an executed non-collusion affidavit with the bid. Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and preservation of public natural resources that affect the project, pursuant to Act No. 247 of the General Assembly of the Commonwealth of Pennsylvania, approved October 26, 1972. This Project falls under The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act ('the Act') which requires all public work contractors and subcontractors to utilize the Federal Government's E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States. All Bidders are required to submit a Public Works Employment Verification Form as a precondition for the Contract Award. The estimated cost of this Project is greater than Two Thousand Dollars ($2,000) and the federal Davis-Bacon Act shall apply. All bids shall be irrevocable for 60 days after the bid opening date unless award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case this Bid shall remain subject to acceptance for 120 days after the bid opening date as provided by the Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). The Houtzdale Municipal Authorityreserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Houtzdale Municipal Authority, and to reject any or all proposals.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents