Similar Projects
New Mosaic Program Building
New Construction
Conception
Humble, TX

Brinkmann Ranch Mixed-Use Development
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Frisco, TX 75035

Fox Tech Campus - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction
Design
$78,871,204 CJ est. value
San Antonio, TX 78205

New Jim Ned ISD Career Tech Facility
New Construction
Design
$2,773,251 est. value
Tuscola, TX

Construction of a Votech Building
New Construction - 7,993 SF
Post-Bid
Richards, TX

Career & Technical Education Center Expansion
Addition
Post-Bid
$21,500,000 est. value
Frisco, TX 75035

Various Upgrades at Clifton Career Development School
New Construction - 38,134 SF
Results
$240,000 est. value
Austin, TX 78752

Code Ninjas
Build-Out - 2,203 SF
Construction
$200,000 est. value
Midland, TX 79705

Center for Educational Excellence and Community Leadership / St. John's Episcopal Church
Renovation - 29,424 SF
Construction
$375,000 CJ est. value
McAllen, TX 78501

Amarillo Area Center for Advanced Learning - Amarillo ISD
Demolition, Build-out, Renovation
Pending Verification
$55,299,618 CJ est. value
Amarillo, TX 79102

Boys & Girls Club of Greater Houston - Rosenberg
New Construction, Infrastructure - 20,000 SF
Pending Verification
$4,700,000 CJ est. value
Rosenberg, TX 77471

2022 Bond - Proposition A - Magnolia Independent School District
New Construction, Renovation, Infrastructure
Conception
$228,000,000 CJ est. value
Magnolia, TX 77355

The Ismaili Center of Houston and Parking Garage
New Construction - 458,314 SF
Design
$176,200,000 est. value
Houston, TX 77019

IDEA THRIVE - IDEA Toros College Prep Campus
Addition - 3,500 SF
Post-Bid
$850,000 est. value
Edinburg, TX 78542

Melissa Montessori Academy
New Construction, Infrastructure
Construction
$2,500,000 CJ est. value
McKinney, TX 75070

Last Updated 09/26/2022 08:40 AM
Project Title

Expansion of BISD Agricultural Facility - Proposition A - 2022 Bond - Belton Independent School District

Physical Address View project details and contacts
City, State (County) Belton, TX 76513   (Bell County)
Category(s) Education
Sub-Category(s) Vocational School
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project calls for the expansion of the BISD agricultural facility. As of June 17, 2022, this bond vote has been approved. Information regarding design team and contractor selection has not been disclosed. A firm timeline for construction has not been established.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents