Similar Projects
Last Updated | 12/03/2020 09:43 AM |
Project Title | J--Boiler Cleaning Services F&O |
Physical Address | View project details and contacts |
City, State (County) | Manchester, NH 03104 (Hillsborough County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Manchester VA Medical Center (VAMC) has three steam generating boilers (boilers #1, #2 and #3 with economizers) and a Heat Recovery Steam Generator (HRSG), that require regular cleaning to coincide with the VA required annual third-party inspections and certification. Boiler #2 is a 150 HP fire tube boiler, and is traditionally the "summer" boiler. Boiler #1 and #3 are 300 HP fire tube boilers, and traditionally the "winter" boilers, used primarily during the colder winter months. The boiler inspections are conducted annually and are scheduled in a manner such that at least one of the two boilers is available for full duty at all times. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |