Similar Projects
2021 Alley Drainage Improvement Project: Hickory Alley Storm Sewer
Infrastructure
Bidding
$379,715 est. value
Groveport, OH 43125

Precast Concrete Headwalls
Post-Bid

Northwest Stormwater Study 611721-100000
Post-Bid
Columbus, OH

Furnishing Bridge LOG-CR21-1.00
Results
Less than $1,748,343 est. value
Columbus, OH

Road and Bridge Improvements
Results
$1,775,598 est. value
Columbus, OH

Jacking and Boring Services
Post-Bid

Holton Park and Eureka Avenue Green Infrastructure Improvements
Results
Columbus, OH

Fabrication and Delivery of Precast Box Culverts and Wingwalls
Infrastructure
Post-Bid
Less than $176,300 est. value
OH

Mound Street Floodwall and W. Col. Protection 611708-100000
Results
Columbus, OH

Bridge Repair Project
Results
Columbus, OH 43085

Bridge Rehablitation - Godown Road Culver
Results
Columbus, OH

Dublin-Granville Road Over Rocky Fork Creek (Fra-Cr546-12.90)
Results
Less than $119,699,983 est. value
New Albany, OH

Drain Systems Cleaning and Repair
Results
Columbus, OH

Ridpath Road Over Stanford Smith Ditch (Jac-Tr270-0.69)
Results
Less than $276,561 est. value
Columbus, OH

Cosgray Ditch Phase 1
Results
Less than $1,375,000 est. value
Dublin, OH

Last Updated 07/21/2021 09:46 AM
Project Title

Improvement of Olentangy River

Physical Address View project details and contacts
City, State (County) OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,409,587
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

At Carhart Ditch, upgrading 450 feet of Olentangy River Road buy providing the replacement of the existing bridge over Carhart Ditch (SHA-CR9-11.40), north of S.R. 161. At Linworth Run, replacement of the existing 3-sided culvert carrying Linworth Run under Olentangy River Road (SHA-CR9-11.62) just north of Whieldon Lane. EBE Goal: 8%

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents